( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
170 LER(III) REVAMPING PROJECT KUMHO P&B CHEM 2020.10~2021.10 E / P / C
169 DETAIL DESIGN & APPROVAL OF BPA HEAVIES LG CHEM 2020.07~2020.12 E
168 GUNSAN PLANT, RE CVD THERMAL STRESS ANALYSIS OCI 2020.07~2020.10 E
167 EPC WORKS FOR VCU INSTALLATION PROJECT S-OIL 2020.06~2020.12 E / P / C
166 DETAIL ENGINEERING SERVICES RELATED TO JPC-550(1,000 L/HR PROCESS UNIT) AND NEW SITE TANK INSTALLTION PROJECT EM TECH 2020.05~2021.06 E
165 PRODUCTION AND INSTALLATION OF 3 TYPES OF OUTDOOR TRAINING FACILITIES NICS 2020.05~2020.12 E / P / C
164 PLANT2 3D-SCANNING/MODELING SERVICE GS CALTEX 2020.05~2020.12 E
163 KP-1 RTO-1 INSTALLATION PROJECT KUMHO POLY CHEM 2020.04~2021.12 E / P / C
162 NEW INSTALLATION OF D-GE/BDG EXPANSION REACTION FACILITY FOR DAESAN PLANT LOTTE CHEM 2020.03~2021.03 E / P / C
161 BASF YEOSU PLANT HCL 35% EXTERNAL NEW PIPING DESIGN & APPROVAL HANWHA SOLUTION 2020.03~2020.06 E
160 BASF YEOSU PLANT HCL 35% EXTERNAL NEW PIPING DESIGN & APPROVAL HANWHA SOLUTION 2020.03~2020.06 E
159 INSTALLATION OF 5 PETROCHEMICAL TANKS & DESIGN OF ADDITIONAL FACILITIES MARINE GLORY 2020.01~2021.12 E
158 LOTTE CHEM INFRA-2 FEED DESIGN LOTTE E&C 2020.01~2020.03 E
157 LG MMA M2 MTBE(METHYL TERTIARY BUTHYL ETHER) EXPANSION DESIGN S&I CORP. 2019.11~2020.12 E
156 LG CHEM Y2C(YEOSU #2 COMPLEX) SAPO PIER EXTERNAL PIPING CONSTRUCTION GS E&C 2019.11~2020.09 E / P / C
155 80,000T/Y KAR(KUMHO ACETONE RECYCLE) PROJECT KUMHO P&B CHEM 2019.10~2021.05 E / P / C
154 SBS(STYRENE BUTADIENE STYRENE) 45,000T REVAMPING PROJECT KUMHO PETRO CHEM 2019.10~2020.08 E / P / C
153 NEW LOGISTICS BASE CONSTRUCTION KUMHO MITSUI CHEM 2019.10~2020.08 E / P / C
152 PIPE RACK SAFETY DIAGNOSIS OF EXTERNAL PIPELINES BETWEEN 10-2,3 SECTIONS YEOSU TECHNICAL DIRECTOR’S COUNCIL 2019.10~2020.01 E
151 DETAILED DESIGN OF VCM1 EDC(ETHYLENE DICHLORIDE) REACTION PROCESS IMPROVEMENT LG CHEM 2019.09~2020.07 E
150 TANK REVAMPING PROJECT PMC TECH 2019.04~2020.03 E
149 2019 SHUTDOWN INVESTMENT CONSTRUCTION PROJECT KUMHO MITSUI CHEM 2019.04~2019.06 E / P / C
148 GS CALTEX MFC PROJECT (PIPING/ELEC./INSTR./CIVIL DESIGN) GS E&C 2019.02~2021.04 E
147 CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(INSIDE THE FACTORY) GS E&C 2019.02~2021.04 E
146 GS CALTEX MFC OUTER PIPE LINE INSTALLATION WORK GS E&C 2019.02~2021.04 E / C
145 LG MMA #3 FACTORY MAA PRODUCT TOWER REPLACEMENT AND INSTALLATION LG MMA 2019.02~2019.11 E / P
144 ETHYLENE & BTX AREA ENERGY SAVING PROJECT YNCC 2019.01~2019.06 E / P / C
143 CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(OUTSIDE THE FACTORY) GS CALTEX 2018.12~2019.06 E
142 SIHWA GABLE-INFRASTRUCTURE EPC PROJECT VERSUM PM KOREA 2018.12~2019.05 E / P / C
141 Y2C PROJECT (3NCC) GS E&C 2018.11~2021.06 E