( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
110 SER(II) PROJECT KUMHO P&B CHEM 2017.05~2018.02 E / P / C
109 ADDITIONAL PIPING INSTALLATION PLAN DUE TO SATURATION OF UNDERGROUND PIPING AT ULSAN ONSAN NATIONAL INDUSTRIAL COMPLEX KICOX 2017.05~2017.11 E
108 LG CHEM DAESAN PLANT BD&BUTENE-1 FACTORY 3D SCANNING & MODELING LG CHEM 2017.05~2017.08 E
107 ULSAN PLANT SPP PROJECT KPIC 2017.03~2018.07 E
106 GS CALTEX No.1 CDU(CRUDE DISTILLATES UNIT) REVAMP PROJECT GS E&C 2017.03~2018.05 E
105 W-TFT CA1 TEAM 35% HYDROCHLORIC ACID SHIPPING INFRASTRUCTURE CONSTRUCTION WORK HANWHA CHEM 2017.02~2017.09 E / P / C
104 IMPROVEMENT CONSTRUCTION FOR MDI EXTENSION BOTTLENECK ELIMINATION KUMHO MITSUI CHEM 2017.02~2017.04 E / P / C
103 3D INSPECTION DRAWING DESIGN FOR OFF-SITE PIPING IN GS CALTEX 1 FACTORY GS CALTEX 2017.01~2018.12 E
102 GUNSAN PLANT, AGRICULTURAL WATER UTILIZATION FACILITY INSTALLATION CONSTRUCTION OCI 2017.01~2017.08 E / P / C
101 LG MMA YEOSU MAA 50,000T PROJECT TIC SERVEONE 2017.01~2017.01 E
100 Y2 REVAMP(CO2 RECYCLE) PROJECT AIR LIQUIDE KOREA 2016.12~2017.11 E / P / C
99 W-3 PLANT INSTALLATION PROJECT SK MATERIALS 2016.12~2017.10 E / P / C
98 A.RUBBER SYSTEM CONSTRUCTION DESIGN LG MMA 2016.12~2017.10 E
97 ABS 65K DEBOTTLENECKING PROJECT LOTTE CHEM 2016.12~2017.08 E / P / C
96 HDO REVAMPING EPC PROJECT DESIGN HYUNDAI ENG 2016.11~2018.12 E
95 STT(I) EXTERNAL STORAGE FACILITIES INSTALLATION KUMHO P&B CHEMICAL 2016.11~2017.07 E / P / C
94 JO MDI 4,000M3 STORAGE TANK INSTALLATION KUMHO MITSUI CHEM 2016.11~2017.04 E / P / C
93 KTPV(Thermo Plastic Vulcanizate)-II PROJECT KUMHO POLY CHEM 2016.10~2017.12 E / P / C
92 MVR(IV) PROJECT KUMHO P&B CHEM 2016.10~2017.01 E / P / C
91 C5 PLANT VLCC INSTALLATION YNCC 2016.10~2016.12 E
90 NO.2 KD/HDS DEWAXING SYSTEM IMPROVEMENT GS CALTEX 2016.08~2017.05 E
89 NAKPOGAC THREE TANK CONSTRUCTION PROJECT (SYP-1601) SY TANK TERMINAL 2016.08~2017.04 E
88 2-LINE FACILITY SUPPLEMENTARY CONSTRUCTION DESIGN KUMHO POLYCHEM 2016.06~2016.11 E
87 PC FACILITY DEBOTTLENECKING BASIC DESIGN LG CHEM 2016.06~2016.10 E
86 DETAIL DESIGN ON THE INSTALLATION OF 2 WASTE WATER STORAGE TANK YNCC 2016.06~2016.08 E
85 MDI-PH CONTINUOUS CRYSTALLIZER INSTALLATION WORK KUMHO MITSUI CHEM 2016.05~2017.04 E / P / C
84 1 PLANT 1-LINE MVR INSTALLATION KUMHO POLYCHEM 2016.05~2016.12 E / P / C
83 SYNGAS COOLER REPLACEMENT EPC CONTRACT LOTTE BP CHEM 2016.04~2017.05 E / P / C
82 E1 MIXED-C4 TRANSPORT-RELATED CONSTRUCTION PROJECTS E1 2016.03~2018.10 E / P / C
81 C9 COLUMN → REFORMATE COLUMN CHANGE GS CALTEX 2016.03~2017.03 E
<< 1 2 3 [4] 5 6 7 / 7 >>