( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
80 | GS CALTEX ULSAN PLANT KILN PROCESS WASTE HEAT RECOVERY SYSTEM FEASIBILITY STUDY | GS CALTEX | 2016.03~2016.04 | E |
79 | GWANGYANG PLANT BTX DBNK PROJECT - PIPING ENGINEERING WORK | OCI | 2016.02~2017.01 | E |
78 | 120D-830/926 TANK FORM FIREFIGHTING SYSTEM DESIGN | GS CALTEX | 2016.01~2016.03 | E |
77 | LG CHEM PC PLANT HEAT PUMP INSTALLATION PROJECT | SERVEONE | 2015.12~2015.12 | E / P / C |
76 | INSTALLING HEAT PUMP(PC PLANT) | LG CHEM | 2015.12~2015.12 | E / P / C |
75 | POLYMERIZATION G-LINE NB LATEX PARALLEL PRODUCTION FACILITY BUILT EPC | KUMHO PETRO CHEM | 2015.11~2017.07 | E / P / C |
74 | AROMATIC OFF-GAS BENZENE RECOVERY DESIGN SERVICES | GS CALTEX | 2015.11~2016.12 | E |
73 | AMS CAPA-UP PROJECT | KUMHO P&B CHEMICAL | 2015.11~2016.06 | E / P / C |
72 | YNCC 2PLANT ENERGY-SAVING PROJECT | YNCC | 2015.11~2016.04 | E / P / C |
71 | CVD REACTOR INSTALLATION & NEW PUMP CONSTRUCTION | HANWHA SILICON | 2015.10~2015.10 | E |
70 | PP3 PROJECT | HYOSUNG | 2015.08~2016.12 | E |
69 | PB2 100,000 MTA REVAMPING PROJECT | DAELIM INDUSTRIAL | 2015.07~2017.07 | E / P / C |
68 | S-OIL SUPER PKG 1,2 3D LASER SCAN | DAELIM INDUSTRIAL | 2015.07~2016.10 | E |
67 | NO.1 AROMATICS HEAT EXCHANGER IMPROVEMENT | GS CALTEX | 2015.07~2016.04 | E |
66 | NO.2 PMMA MS PRODUCTION FACILITY BUILDING CONSTRUCTION | LG MMA | 2015.07~2016.01 | E / P / C |
65 | LP-1 RECOVERY PROCESS, DETAIL DESIGN FOR INCREASE CAPACITY | HANWHA CHEM | 2015.07~2015.10 | E |
64 | MTPX ENERGY EFFICIENCY DESIGN SERVICE | GS CALTEX | 2015.06~2016.05 | E |
63 | MVR II PROJECT | KUMHO P&B CHEM | 2015.06~2016.04 | E / P / C |
62 | PSV REAR-END EMISSION TREATMENT SYSTEM CONSTRUCTION | LG CHEM | 2015.06~2015.12 | E |
61 | C1-POWDER PACKAGING BASIC DESIGN | ORION | 2015.06~2015.09 | E |
60 | J-LINE STRIPPER ADDITIONAL INSTALLATION | KUMHO PETRO CHEM | 2015.06~2015.06 | E |
59 | KP-I PLANT 2-LINE MVR PROJECT | KUMHO POLY CHEM | 2015.04~2015.11 | E / P / C |
58 | P2 CVD HEAT RECOVERY SYSTEM | OCI | 2015.04~2015.09 | E / P / C |
57 | MATERIAL CONVERSION PROJECT | DEOKYANG | 2015.03~2015.12 | E / P / C |
56 | PMMA1 PLANT, 3 TANK INSTALLATION | LG-MMA | 2015.02~2015.07 | E / P / C |
55 | INSTALLING TWO C4 BALL TANK | KUMHO PETRO CHEM | 2015.01~2015.12 | E / P / C |
54 | PB2 75,000 MTA REVAMPING PROJECT | DAELIM | 2014.11~2016.05 | E |
53 | POLY SILICON CAPA-UP DETAIL DESIGN | HANWHA CHEM | 2014.11~2015.08 | E |
52 | COC(COCL2) COMPRESSOR INSTALLATION | KUMHO MITSUI CHEM | 2014.11~2015.06 | E / P / C |
51 | DAESAN EG(ETHYLENE GLYCOL)1 PLANT DB(DEBOTTLENECK) PROJECT | LOTTE E&C | 2014.10~2016.09 | E / P / C |