( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
561 | VCU INSTALLATION PROJECT FINAL STEP | S-OIL | 2024.12~2026.03 | E / P / C |
560 | FEASIBILITY STUDY SERVICE FOR OSBL PIPING AND STEEL STRUCTURES | DIG AIR GAS | 2024.11~2025.02 | E |
559 | PRE-ENGINEERING SERVICE FOR #1 PX LPI (LIQUID PHASE ISOMERIZATION) PROCESS CONSTRUCTION | S-OIL | 2024.11~2024.12 | E |
558 | AURORA PROJECT (CHUNGNAM) – DETAILED DESIGN OUTSOURCING (PIPING, ELECTRICAL, INSTRUMENTATION, CAS) | GS E&C | 2024.11~2027.07 | E |
557 | YONGJAM PLANT CONVERSION WORK (DETAILED DESIGN, REGULATORY PERMITS, ETC.) SERVICE | GS ENTEC | 2024.10~2025.03 | E |
556 | NMP PLANT BASIC & FEED EXECUTION | JAEWON INDUSTRIAL | 2024.10~2025.02 | E |
555 | OSBL AND AUXILIARY FACILITIES BASIC & FEED EXECUTION | JAEWON INDUSTRIAL | 2024.10~2025.02 | E |
554 | MALAYSIA MP11 PROJECT (125TON/HR NATURAL GAS BOILER PACKAGE) | OCIM SDN. BHD. | 2024.08~2026.02 | E / P / C |
553 | INDONESIA 300,000TPA POLYPROPYLENE PLANT BALONGAN PROJECT | HYUNDAI ENG | 2024.07~2025.05 | E |
552 | PRE-ENGINEERING FOR THE INTRODUCTION OF THE 2ND PLANT 3-LINE NEW MVR | KUMHO POLY CHEM | 2024.07~2024.11 | E |
551 | 30 MTPA NO(NITRIC OXIDE) PLANT BASIC DESIGN PACKAGE | HANWHA | 2024.07~2024.11 | E |
550 | PELLET-III PROJECT (EPDM 10,000MTPA) | KUMHO POLY CHEM | 2024.05~2025.08 | E / P / C |
549 | PROJECT TO RELOCATE AND INSTALL EQUIPMENT FROM THE CNT FACTORY IN ASAN TO YULCHON CNT FACTORY 1 | KUMHO PETRO CHEM | 2024.05~2025.02 | E / P / C |
548 | NO.1 MDI PLANT ENERGY SAVING PROJECT | KUMHO MITSUI CHEM | 2024.05~2024.07 | E / P / C |
547 | NO.2 PLANT ENERGY SAVING PROJECT | KUMHO MITSUI CHEM | 2024.05~2024.07 | E / P / C |
546 | EPC INVESTMENT CONSTRUCTION TO SECURE EMERGENCY RESPONSE FLEXIBILITY FOR EACH PRODUCT BETWEEN NO.1 AND 2 PLANT | KUMHO MITSUI CHEM | 2024.05~2024.07 | E / P / C |
545 | ENGINEERING WORK OF JINDO EPC | BASF HANNONG CHEM SOLUTIONS | 2024.05~2024.07 | E |
544 | HIGH THROUGHPUT TFT DESIGN SERVICE | S-OIL | 2024.05~2024.06 | E |
543 | PRE-ENGINEERING AND COST ESTIMATION SERVICES FOR DEMOLITION AND RELOCATION OF EXISTING FACILITIES AT GTG'S PLANNED SITE | S-OIL | 2024.04~2024.07 | E |
542 | FLARE SYSTEM LOAD ANALYSIS AND BASIC DESIGN | LOTTE CHEM | 2024.04~2024.04 | E |
541 | SUPPLEMENTATION OF HIGH-PRESSURE GAS PRECISION SAFETY DIAGNOSIS FINDINGS | LOTTE CHEM | 2024.04~2024.12 | E |
540 | FEED DESIGN FOR COMMERCIALIZATION OF HPC (1,000TPA) | LOTTE FINE CHEM | 2024.03~2024.10 | E |
539 | DAESAN PLANT OSBL INFRASTRUCTURE EPC PROJECT | LG CHEM | 2024.03~2025.07 | E / P / C |
538 | LOTTE GS CHEMICAL STEAM SUPPLY PIPING INSTALLATION DETAIL DESIGN | HANWHA ENERGY | 2024.02~2024.08 | E |
537 | BP ITEM PRE-ENGINEERING & COST ESTIMATION | S-OIL | 2024.02~2024.06 | E |
536 | NORMAL INVESTMENT CONSTRUCTION IN 2023 | KUMHO MITSUI CHEM | 2024.02~2024.05 | E / P / C |
535 | CCS PILOT PLANT (1MW) OSBL BASIC ENGINEERING, FEED DESIGN SERVICE | KEPCO E&C | 2024.02~2024.06 | E |
534 | CONSTRUCTION OF 1,000TPA MONOSCONSTRUCTION OF 1,000TON/YEAR MONOSILANE(SiH4) PRODUCTION PLANT IN GUNSAN | OCI | 2024.01~2025.04 | E / P / C |
533 | KOREA LITHIUM HYDROXIDE GRINDING PROCESS CONSTRUCTION PROJECT ENGINEERING | KOREA JAESAE NEUNGWON | 2024.01~2024.05 | E |
532 | BALL TANK EARTHQUAKE-RESISTANT DESIGN | S-OIL | 2024.01~2024.07 | E |