( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
539 FEED DESIGN TO REVIEW ECONOMIC FEASIBILITY OF COMMERCIALIZATION OF NEW GREEN MATERIAL BUSINESS ITEMS LOTTE FINE CHEM 2024.03~2024.10 E
538 DAESAN PLANT OSBL EPC PROJECT LG CHEM 2024.03~2025.07 E / P / C
537 LOTTE GS CHEMICAL STEAM SUPPLY PIPING INSTALLATION DETAIL DESIGN HANWHA ENERGY 2024.02~2024.08 E
536 BP ITEM PRE-ENGINEERING & COST ESTIMATION S-OIL 2024.02~2024.06 E
535 NORMAL INVESTMENT CONSTRUCTION IN 2023 KUMHO MITSUI CHEM 2024.02~2024.05 E / P / C
534 CCS PILOT PLANT (1MW) OSBL BASIC ENGINEERING, FEED DESIGN SERVICE KEPCO E&C 2024.02~2024.06 E
533 CONSTRUCTION OF 1,000TON/YEAR MONOSILANE(SiH4) PRODUCTION PLANT IN GUNSAN OCI 2024.01~2025.04 E / P / C
532 BALL TANK EARTHQUAKE-RESISTANT DESIGN S-OIL 2024.01~2024.07 E
531 PHU RAW C5 SEPARATION FACILITY INSTALLATION ENERGY SAVING DESIGN GS E&C 2024.01~2025.03 E
530 BT PROCESS CAPACITY INCREASE LICENSE ACQUISITION SERVICE GS CALTEX 2023.12~2024.05 E
529 BASIC DESIGN AND INVESTMENT COST CALCULATION SERVICE FOR PET CHEMICAL REGENERATION PLANT KOLON INDUSTRY 2023.11~2024.03 E
528 DESIGN SERVICE FOR THE REVIEW OF DEMOLITION VOLUME OF OPERATION RESTING FACILITIES S-OIL 2023.11~2023.12 E
527 PLANT 1 RTO-3(47,000NM3/HR 2EA) NEW INSTALLATION PROJECT KUMHO POLY CHEM 2023.10~2024.07 E / P / C
526 PLANT 1 VCU(1,200NM3/HR) NEW INSTALLATION PROJECT KUMHO POLY CHEM 2023.10~2024.07 E / P / C
525 EVERGREEN FEED & UTILITY PROJECT (PROCESS, PIPING, ELECTRICAL, INSTRUMENT, CIVIL DETAIL DESIGN) GS E&C 2023.08~2025.08 E
524 CONSTRUCTION OF POWER SUPPLY FACILITIES IN PLANT 3 KUMHO P&B CHEM 2023.08~2024.06 E / P / C
523 PRE-ENGINEERING FOR INTRODUCTION OF LOW-PRESSURE TURBO CHILLER IN PLANT 1 KUMHO POLY CHEM 2023.07~2023.10 E
522 G2 GAS RECTIFIER EPC PROJECT DAIKIN ADVANCED MATERIALS 2023.07~2024.03 E / P / C
521 12,000 BPSD HYDROSKIMMING REFINERY BAYELSA, NIGERIA - BDP AND UTILITIES AZIKEL 2023.07~2024.12 E / P / CM
520 AP SYNTHESIS NEW CONSTRUCTION PROCESS BASIC DESIGN HANWHA AEROSPACE 2023.07~2023.09 E
519 HIGH NICKEL CATHODE MATERIAL NEW LINE CONSTRUCTION PHASE 2 PROJECT KOREA JAESAE NEUNGWON 2023.07~2024.01 E
518 2023 CURRENT INVESTMENT EPC CONSTRUCTION KUMHO MITSUI CHEM 2023.06~2023.12 E / P / C
517 LG CHEM AURORA PROJECT FEED & DETAILED DESIGN GS E&C 2023.06~2023.12 E
516 PIPE RACK EXTENSION DESIGN AND APPROVAL FOR OUTSIDE PIPELINE LG CHEM 2023.05~2023.12 E
515 6 INCH MULTI-PURPOSE PIPELINE TO JETTY BASF 2023.05~2023.09 E
514 MFC DEBOTTLENECK/ENERGY SAVING PROJECT GS E&C 2023.05~2025.03 E
513 JAC20 REVAMPING PROJECT DETAIL DESIGN JAEWON INDUSTRIAL 2023.05~2024.01 E
512 EVERGREEN PROJECT GS E&C 2023.04~2025.08 E
511 BIO-PA PILOT CONSTRUCTION(ISBL) LG CHEM 2023.04~2023.10 P / C
510 PROJECT TO CONNECT H2 LINE/CO LINE/VENT LINE TO KMCI BLOCK AT Y2 PLANT ISBL AIR LIQUIDE KOREA 2023.04~2023.10 E / P / C
<< [1] 2 3 4 5 6 7 8 9 10 / 18 > >>