( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
239 | MDI REFINING SYSTEM IMPROVEMENT WORK | KUMHO MITSUI CHEM | 2016.08~2016.10 | E / P / C |
238 | NAKPOGAC THREE TANK CONSTRUCTION PROJECT (SYP-1601) | SY TANK TERMINAL | 2016.08~2017.04 | E |
237 | YEOSU GREEN ENERGY STEAM SUPPLY SYSTEM | YEOSU GREEN ENERGY | 2016.08~2018.12 | E |
236 | DESIGN AND PERMIT FOR INSTALLATION OF HYDROCHLORIC ACID SHIPPING INFRASTRUCTURE FOR W-TFT CA PRODUCTION TEAM 1 | HANWHA CHEM | 2016.08~2016.10 | E |
235 | SAPO 600,000BBL TANK DESIGN AND PERMIT | GS CALTEX | 2016.07~2020.06 | E |
234 | E(ETHYLENE PROPYLENE OLIGOMER) PROJECT DESIGN & APPROVAL | DAELIM INDUSTRIAL | 2016.07~2017.09 | E |
233 | YEOSU PLANT H-EG1/2, WASTE HEAT RECOVERY REFRIGERATOR IMPROVEMENT CONSTRUCTION | LOTTE CHEM | 2016.06~2017.05 | E / P / C |
232 | I-FA102 & ADDITIONAL FACILITIES REPLACEMENT WORK | KUMHO MITSUI CHEM | 2016.06~2017.01 | E / P / C |
231 | SR2 PROJECT MECHANICAL DESIGN | METS | 2016.05~2016.12 | E |
230 | 1PLANT 1-LINE MVR(MECHANICAL VAPOR RECOMPRESSION) INSTALLATION | KUMHO POLY CHEM | 2016.05~2016.12 | E / P / C |
229 | CR-MDI TANK INSTALLATION WORK AFTER REMOVING V-FB106,107 TANK | KUMHO MITSUI CHEM | 2016.05~2016.08 | E / P / C |
228 | CR-MDI STORAGE TANK INSTALLATION WORK AFTER DEMOLITION OF M-FB452 TANK | KUMHO MITSUI CHEM | 2016.05~2016.08 | E / P / C |
227 | YEOSU CHEMICAL PC D/B TIC PROPOSAL | SERVEONE | 2016.05~2016.06 | E |
226 | MDI(METHYLENE DIPHENYL ISOCYANATE)-PH CONTINUOUS CRYSTALLIZER INSTALLATION WORK | KUMHO MITSUI CHEM | 2016.05~2017.05 | E / P / C |
225 | SYNGAS COOLER REPLACEMENT EPC CONTRACT | LOTTE BP CHEM | 2016.04~2017.05 | E / P / C |
224 | E1 MIXED-C4 TRANSPORT-RELATED CONSTRUCTION PROJECTS | E1 | 2016.03~2018.10 | E / P / C |
223 | SEOKHWA 1 TEAM C9 COLUMN CHANGED TO REFORMATE COLUMN | GS CALTEX | 2016.03~2017.03 | E |
222 | PIPING DESIGN FOR BTX(BENZENE TOLUENE XYLENE) DBNK PROJECT | OCI | 2016.02~2016.12 | E |
221 | HIGH PRESSURE(#850) STEAM INTRODUCTION DETAILED DESIGN AND FEASIBILITY STUDY | GS CALTEX | 2015.12~2015.12 | E |
220 | MVR(MECHANICAL VAPOR RECOMPRESSION) PACKAGE MANUFACTURE & INSTALLATION | KUMHO MITSUI CHEM | 2015.11~2017.10 | E / P / C |
219 | AMS(ALPHA METHYL STYRENE) CAPA-UP PROJECT | KUMHO P&B CHEM | 2015.11~2016.05 | E / P / C |
218 | YNCC 2PLANT ENERGY-SAVING PROJECT | YNCC | 2015.11~2016.06 | E / P / C |
217 | HEAVY TEST FACILITY REACTOR AND AUXILIARY FACILITY REPLACEMENT WORK ADDITIONAL WORK | KUMHO MITSUI CHEM | 2015.11~2015.11 | E / P / C |
216 | BENZENE RECOVERY IN AROMATIC OFF-GAS DESIGN SERVICE | GS CALTEX | 2015.11~2016.12 | E |
215 | POLYMERIZATION G-LINE NB LATEX PARALLEL PRODUCTION FACILITY CAPA UP | KUMHO PETRO CHEM | 2015.11~2017.07 | E / P / C |
214 | H-PC,IMPROVE PRODUCTIVITY THROUGH 3TH DEBOTTLENECKING | LOTTE CHEM | 2015.11~2016.07 | E / P / C |
213 | DESIGN RELATED TO ESTABLISHMENT OF PSV REAR END EMISSION TREATMENT SYSTEM | LOTTE CHEM | 2015.11~2016.06 | E |
212 | POE SEMI-COMMERCIAL PLANT PDP MANUFACTURE | LOTTE CHEM | 2015.11~2016.03 | E |
211 | DETAILED DESIGN AND PERMIT FOR CVD INCREASE | HANWHA CHEM | 2015.10~2015.10 | E |
210 | DETAILED DESIGN OF S-OIL RUC PROJECT SITE, AREA-5(REVAMPING OF EXIST.FAC.) | DAELIM INDUSTRIAL | 2015.10~2019.01 | E |