( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
239 MDI REFINING SYSTEM IMPROVEMENT WORK KUMHO MITSUI CHEM 2016.08~2016.10 E / P / C
238 NAKPOGAC THREE TANK CONSTRUCTION PROJECT (SYP-1601) SY TANK TERMINAL 2016.08~2017.04 E
237 YEOSU GREEN ENERGY STEAM SUPPLY SYSTEM YEOSU GREEN ENERGY 2016.08~2018.12 E
236 DESIGN AND PERMIT FOR INSTALLATION OF HYDROCHLORIC ACID SHIPPING INFRASTRUCTURE FOR W-TFT CA PRODUCTION TEAM 1 HANWHA CHEM 2016.08~2016.10 E
235 SAPO 600,000BBL TANK DESIGN AND PERMIT GS CALTEX 2016.07~2020.06 E
234 E(ETHYLENE PROPYLENE OLIGOMER) PROJECT DESIGN & APPROVAL DAELIM INDUSTRIAL 2016.07~2017.09 E
233 YEOSU PLANT H-EG1/2, WASTE HEAT RECOVERY REFRIGERATOR IMPROVEMENT CONSTRUCTION LOTTE CHEM 2016.06~2017.05 E / P / C
232 I-FA102 & ADDITIONAL FACILITIES REPLACEMENT WORK KUMHO MITSUI CHEM 2016.06~2017.01 E / P / C
231 SR2 PROJECT MECHANICAL DESIGN METS 2016.05~2016.12 E
230 1PLANT 1-LINE MVR(MECHANICAL VAPOR RECOMPRESSION) INSTALLATION KUMHO POLY CHEM 2016.05~2016.12 E / P / C
229 CR-MDI TANK INSTALLATION WORK AFTER REMOVING V-FB106,107 TANK KUMHO MITSUI CHEM 2016.05~2016.08 E / P / C
228 CR-MDI STORAGE TANK INSTALLATION WORK AFTER DEMOLITION OF M-FB452 TANK KUMHO MITSUI CHEM 2016.05~2016.08 E / P / C
227 YEOSU CHEMICAL PC D/B TIC PROPOSAL SERVEONE 2016.05~2016.06 E
226 MDI(METHYLENE DIPHENYL ISOCYANATE)-PH CONTINUOUS CRYSTALLIZER INSTALLATION WORK KUMHO MITSUI CHEM 2016.05~2017.05 E / P / C
225 SYNGAS COOLER REPLACEMENT EPC CONTRACT LOTTE BP CHEM 2016.04~2017.05 E / P / C
224 E1 MIXED-C4 TRANSPORT-RELATED CONSTRUCTION PROJECTS E1 2016.03~2018.10 E / P / C
223 SEOKHWA 1 TEAM C9 COLUMN CHANGED TO REFORMATE COLUMN GS CALTEX 2016.03~2017.03 E
222 PIPING DESIGN FOR BTX(BENZENE TOLUENE XYLENE) DBNK PROJECT OCI 2016.02~2016.12 E
221 HIGH PRESSURE(#850) STEAM INTRODUCTION DETAILED DESIGN AND FEASIBILITY STUDY GS CALTEX 2015.12~2015.12 E
220 MVR(MECHANICAL VAPOR RECOMPRESSION) PACKAGE MANUFACTURE & INSTALLATION KUMHO MITSUI CHEM 2015.11~2017.10 E / P / C
219 AMS(ALPHA METHYL STYRENE) CAPA-UP PROJECT KUMHO P&B CHEM 2015.11~2016.05 E / P / C
218 YNCC 2PLANT ENERGY-SAVING PROJECT YNCC 2015.11~2016.06 E / P / C
217 HEAVY TEST FACILITY REACTOR AND AUXILIARY FACILITY REPLACEMENT WORK ADDITIONAL WORK KUMHO MITSUI CHEM 2015.11~2015.11 E / P / C
216 BENZENE RECOVERY IN AROMATIC OFF-GAS DESIGN SERVICE GS CALTEX 2015.11~2016.12 E
215 POLYMERIZATION G-LINE NB LATEX PARALLEL PRODUCTION FACILITY CAPA UP KUMHO PETRO CHEM 2015.11~2017.07 E / P / C
214 H-PC,IMPROVE PRODUCTIVITY THROUGH 3TH DEBOTTLENECKING LOTTE CHEM 2015.11~2016.07 E / P / C
213 DESIGN RELATED TO ESTABLISHMENT OF PSV REAR END EMISSION TREATMENT SYSTEM LOTTE CHEM 2015.11~2016.06 E
212 POE SEMI-COMMERCIAL PLANT PDP MANUFACTURE LOTTE CHEM 2015.11~2016.03 E
211 DETAILED DESIGN AND PERMIT FOR CVD INCREASE HANWHA CHEM 2015.10~2015.10 E
210 DETAILED DESIGN OF S-OIL RUC PROJECT SITE, AREA-5(REVAMPING OF EXIST.FAC.) DAELIM INDUSTRIAL 2015.10~2019.01 E
<< < [11] 12 13 14 15 16 17 18 / 18 >>