( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
149 HR(HEXANE RECOVERY)-Ⅱ KOREA PETRO CHEM 2013.05~2014.03 E
148 NEW CRUDE TANK (800,000 BARREL) PROJECT GS CALTEX 2013.04~2015.12 E
147 DESIGN & APPROVAL OF LAND & MARINE FACILITIES FOR NO.3 PRODUCT PIER GS CALTEX 2013.04~2019.12 E
146 IPC PILOT PLANT INSTALLATION PROJECT KUMHO MITSUI CHEM 2013.03~2013.09 E / P / C
145 BRU(BENZENE RECOVERY UNIT) 60,000MT DEBOTTLENECKING PROJECT(EDC: ETHYLENE DICHLORIDE) LG CHEM 2013.02~2013.11 E
144 EGKr HOT PROJECT (PIPING/DUCT & CHUTE) TOYO ENG 2013.01~2013.12 E / C
143 AP SYNTHETIC RECRYSTALLIZATION PROCESS EXPANSION HANWHA 2013.01~2014.01 E
142 17 CASES INCLUDING M-GB301B/C SUCTION SIZE-UP AND ADDITIONAL PIPING INSTALLATION KUMHO MITSUI CHEM 2013.01~2013.04 E / P / C
141 W.W.T(WASTE WATER TREATMENT) FACILITIES EXPANSION PROJECT KUMHO PETRO CHEM 2013.01~2016.07 E / P / C
140 HYDROGEN RECOVERY UNIT STRUCTURE POSCO ENERGY 2013.01~2013.07 C
139 HDO(HEAVY DUTY OIL) STORAGE TANK FARM CONSTRUCTION MANAGEMENT HYUNDAI OIL TERMINAL 2012.12~2013.12 E / P / C
138 INSTALLATION OF PIPE RACKS FOR 26 SECTIONS OF COMMON PIPE RACKS IN YEOSU INDUSTRIAL COMPLEX KUMHO PETRO CHEM 2012.11~2013.02 E / P / C
137 MANUFACTURING AND INSTALLATION WORK RELATED TO REPLACEMENT OF 15 UNITS INCLUDING M-EA160 KUMHO MITSUI CHEM 2012.11~2013.03 E / P / C
136 GSC VGOFCC PROJECT SAPO-PIPELINE SYNTHESIS DESIGN GS E&C 2012.10~2013.01 E
135 HEXANE PROCESS BEDP PROJECT KUMHO PETRO CHEM 2012.10~2013.03 E
134 LG CHEM SM PLANT HEAT SUPPLY PIPE DESIGN HYUNDAI E&C 2012.10~2014.01 E
133 UZBEKISTAN UGCC ETHYLENE 600,000MT/Y PROJECT (MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) GS E&C 2012.10~2015.01 E
132 NO.4 CDU O/H COMPRESSOR 1 ADDITIONAL INSTALLATION DETAILED DESIGN GS CALTEX 2012.10~2013.10 E
131 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING 2ND ADDITIONAL FACILITY INVESTMENT WORK KUMHO MITSUI CHEM 2012.09~2012.12 E / P / C
130 DIBK(DIISOBUTYL KETONE) DISTILLATION TOWER INSTALLATION PROJECT KUMHO P&B CHEM 2012.08~2012.12 E / P / C
129 LP-1 EXTRUDER & PPB EXTENSION CONSTRUCTION PROJECT HANWHA CHEM 2012.07~2013.04 E / P / C
128 ESTABLISHMENT OF SOLVENT RECOVERY SYSTEM DURING RECYCLE BD KUMHO PETRO CHEM 2012.06~2012.12 E / P / C
127 KUMHO YEP-IV(EPDM) VOC TREATMENT PACKAGE PROJECT DAELIM INDUSTRIAL 2012.06~2013.05 E / P / C
126 HCC SCR(SELECTIVE CATALYTIC REDUCTION) PROJECT HANWHA E&C 2012.05~2013.03 E
125 VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) FIELD ENGINEERING (PIPING/CIVIL) GS E&C 2012.05~2013.02 FE
124 MAA(METHYL METHACRYLATE) EXPANSION PROJECT (PROCESS/MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) GS E&C 2012.04~2013.01 E
123 VCM 30,000MT DEBOTTLENECKING PROJECT DETAILED DESIGN LG CHEM 2012.04~2012.12 E
122 HYPER SALINE WASTE WATER TREATMENT SYSTEM INSTALLATION PROJECT KUMHO MITSUI CHEM 2012.03~2012.09 E / P / C
121 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT MVR(MECHANICAL VAPOR RECOMPRESSING) SYSTEM INSTALLATION KUMHO MITSUI CHEM 2012.02~2012.08 E / P / C
120 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING ADDITIONAL FACILITY INVESTMENT WORK KUMHO MITSUI CHEM 2012.02~2012.07 E / P / C