( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
149 | HR(HEXANE RECOVERY)-Ⅱ | KOREA PETRO CHEM | 2013.05~2014.03 | E |
148 | NEW CRUDE TANK (800,000 BARREL) PROJECT | GS CALTEX | 2013.04~2015.12 | E |
147 | DESIGN & APPROVAL OF LAND & MARINE FACILITIES FOR NO.3 PRODUCT PIER | GS CALTEX | 2013.04~2019.12 | E |
146 | IPC PILOT PLANT INSTALLATION PROJECT | KUMHO MITSUI CHEM | 2013.03~2013.09 | E / P / C |
145 | BRU(BENZENE RECOVERY UNIT) 60,000MT DEBOTTLENECKING PROJECT(EDC: ETHYLENE DICHLORIDE) | LG CHEM | 2013.02~2013.11 | E |
144 | EGKr HOT PROJECT (PIPING/DUCT & CHUTE) | TOYO ENG | 2013.01~2013.12 | E / C |
143 | AP SYNTHETIC RECRYSTALLIZATION PROCESS EXPANSION | HANWHA | 2013.01~2014.01 | E |
142 | 17 CASES INCLUDING M-GB301B/C SUCTION SIZE-UP AND ADDITIONAL PIPING INSTALLATION | KUMHO MITSUI CHEM | 2013.01~2013.04 | E / P / C |
141 | W.W.T(WASTE WATER TREATMENT) FACILITIES EXPANSION PROJECT | KUMHO PETRO CHEM | 2013.01~2016.07 | E / P / C |
140 | HYDROGEN RECOVERY UNIT STRUCTURE | POSCO ENERGY | 2013.01~2013.07 | C |
139 | HDO(HEAVY DUTY OIL) STORAGE TANK FARM CONSTRUCTION MANAGEMENT | HYUNDAI OIL TERMINAL | 2012.12~2013.12 | E / P / C |
138 | INSTALLATION OF PIPE RACKS FOR 26 SECTIONS OF COMMON PIPE RACKS IN YEOSU INDUSTRIAL COMPLEX | KUMHO PETRO CHEM | 2012.11~2013.02 | E / P / C |
137 | MANUFACTURING AND INSTALLATION WORK RELATED TO REPLACEMENT OF 15 UNITS INCLUDING M-EA160 | KUMHO MITSUI CHEM | 2012.11~2013.03 | E / P / C |
136 | GSC VGOFCC PROJECT SAPO-PIPELINE SYNTHESIS DESIGN | GS E&C | 2012.10~2013.01 | E |
135 | HEXANE PROCESS BEDP PROJECT | KUMHO PETRO CHEM | 2012.10~2013.03 | E |
134 | LG CHEM SM PLANT HEAT SUPPLY PIPE DESIGN | HYUNDAI E&C | 2012.10~2014.01 | E |
133 | UZBEKISTAN UGCC ETHYLENE 600,000MT/Y PROJECT (MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) | GS E&C | 2012.10~2015.01 | E |
132 | NO.4 CDU O/H COMPRESSOR 1 ADDITIONAL INSTALLATION DETAILED DESIGN | GS CALTEX | 2012.10~2013.10 | E |
131 | MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING 2ND ADDITIONAL FACILITY INVESTMENT WORK | KUMHO MITSUI CHEM | 2012.09~2012.12 | E / P / C |
130 | DIBK(DIISOBUTYL KETONE) DISTILLATION TOWER INSTALLATION PROJECT | KUMHO P&B CHEM | 2012.08~2012.12 | E / P / C |
129 | LP-1 EXTRUDER & PPB EXTENSION CONSTRUCTION PROJECT | HANWHA CHEM | 2012.07~2013.04 | E / P / C |
128 | ESTABLISHMENT OF SOLVENT RECOVERY SYSTEM DURING RECYCLE BD | KUMHO PETRO CHEM | 2012.06~2012.12 | E / P / C |
127 | KUMHO YEP-IV(EPDM) VOC TREATMENT PACKAGE PROJECT | DAELIM INDUSTRIAL | 2012.06~2013.05 | E / P / C |
126 | HCC SCR(SELECTIVE CATALYTIC REDUCTION) PROJECT | HANWHA E&C | 2012.05~2013.03 | E |
125 | VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) FIELD ENGINEERING (PIPING/CIVIL) | GS E&C | 2012.05~2013.02 | FE |
124 | MAA(METHYL METHACRYLATE) EXPANSION PROJECT (PROCESS/MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) | GS E&C | 2012.04~2013.01 | E |
123 | VCM 30,000MT DEBOTTLENECKING PROJECT DETAILED DESIGN | LG CHEM | 2012.04~2012.12 | E |
122 | HYPER SALINE WASTE WATER TREATMENT SYSTEM INSTALLATION PROJECT | KUMHO MITSUI CHEM | 2012.03~2012.09 | E / P / C |
121 | MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT MVR(MECHANICAL VAPOR RECOMPRESSING) SYSTEM INSTALLATION | KUMHO MITSUI CHEM | 2012.02~2012.08 | E / P / C |
120 | MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING ADDITIONAL FACILITY INVESTMENT WORK | KUMHO MITSUI CHEM | 2012.02~2012.07 | E / P / C |