( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
479 | BASIC DESIGN OF 810 TONS/DAY 30% FUMING SULFURIC ACID MANUFACTURING FACILITY | NAMHAE CHEM | 2022.05~2023.08 | E |
478 | LG CHEM ABS REBUILDING PROJECT | LG CHEM | 2022.05~2022.06 | E |
477 | DESIGN SERVIED RELATED TO DISSOLVED REFINED SALT BUSINESS(PHASE 1) | HANJU | 2022.05~2022.09 | E |
476 | VANADIUM ELECTROLYTE 480M3/YEAR PRODUCTION PLANT CONSTRUCTION | LOTTE CHEM | 2022.05~2023.06 | E / P / C |
475 | LDPE EXTERNAL PIPING PIPE RACK EXTENSION DESIGN | LG CHEM | 2022.05~2022.12 | E |
474 | FACTORY 1,2 RTO(12000NM3/HR, 23000NM3/HR) INSTALLATION PROJECT | KUMHO P&B CHEM | 2022.05~2023.01 | E / P / C |
473 | VOC IMPROVEMENT DESIGN | KUMHO POLY CHEM | 2022.05~2022.08 | E |
472 | LLDPE WEATHER PILOT OSBL FEED, TIC SERVICE | LG CHEM | 2022.04~2022.07 | E |
471 | DAEGU JEODU DISTRICT VILLAGE SEWERAGE MAINTENANCE PROJECT | GANGJIN-GUN, JEONNAM | 2022.04~2024.04 | P / C |
470 | PLANT IMPROVEMENT DESIGN | KUMHO POLY CHEM | 2022.04~2022.12 | E |
469 | PLANT ANNUAL SHUT-DOWN PROJECT | KUMHO MITSUI CHEM | 2022.04~2022.11 | E / P / C |
468 | DETAILED DESIGN FOR INTRODUCTION OF HIGH-CONCENTRATION PROCESS IN YEOSU PC PLANT | LG CHEM | 2022.03~2023.05 | E |
467 | DAESAN O PILOT 2nd PROJECT BASIC DESIGN & TIC SERVICE | LG CHEM | 2022.03~2022.06 | E |
466 | YEOSU NCC 2 PLANT RAW C5 EXPANSION DETAILED DESIGN | LOTTE CHEM | 2022.02~2022.12 | E |
465 | YEOSU HDPE PLANT LINE-1 PROCESS DESIGN | LG CHEM | 2022.02~2022.04 | E |
464 | 5 LINE BASIC ENGINEERING DESIGN | KUMHO POLY CHEM | 2022.01~2022.02 | E |
463 | GUNDONG BIJA DISTRICT VILLAGE SEWERAGE MAINTENANCE PROJECT | GANGJIN-GUN, JEONNAM | 2022.01~2024.01 | P / C |
462 | LP PROCESS 60KTA NEW REVAMPING PROJECT | KUMHO P&B CHEM | 2022.01~2023.04 | E / P / C |
461 | L-NC PROJECT RELATED EXTERNAL C3 LPG PIPING FEASIBILITY STUDY | LOTTE CHEM | 2022.01~2022.06 | E |
460 | YEOSU INDUSTRIAL COMPLEX PUBLIC PIPE RACK PHASE 4 CONSTRUCTION(INCREASED STAGE) DETAILED DESIGN | KICOX | 2022.01~2022.07 | E |
459 | 500KG/DAY H2 PRODUCTION PROCESS DETAILED DESIGN | WONIK MATERIALS | 2021.12~2022.05 | E |
458 | DETAILED DESIGN SERVICE RELATED TO THE EXTENSION OF 3 NMP TOWERS AT THE HUNGARY PLANT | JAEWON INDUSTRIAL | 2021.12~2022.05 | E |
457 | PURGE GAS SUPPLY PIPE REVIEW SERVICE | GS E&C | 2021.12~2022.01 | E |
456 | 3 LINE DEBOTTLENECKING PROJECT RELATED WORK | KUMHO POLY CHEM | 2021.12~2022.08 | E / P / C |
455 | ABS PLANT FLARE STACK NEW CONSTRUCTION DETAILED DESIGN | LG CHEM | 2021.12~2023.03 | E |
454 | DESIGN OF A NEW PLANT TO PRODUCE 50000MT/Y OF PBAT(POLYBUTYLENE ADIPATE TEREPHTHALATE) | S&I CORP. | 2021.11~2023.12 | E |
453 | 4 LINE MVR(UC-403) NEW INSTALLATION PROJECT RELATED WORK | KUMHO POLY CHEM | 2021.11~2022.11 | E / P / C |
452 | TRANSPARENT ABS DEBOTTLENECKING PROJECT | LG CHEM | 2021.11~2022.04 | E |
451 | BASIC DESIGN SERVICE FOR PURIOGEN YEOSU PG-1 PLANT ESTABLISHMENT | PURIOGEN | 2021.11~2022.03 | E |
450 | BDP & TIC SERVICE FOR THE ESTABLISHMENT OF AN 80,000TONS MMA(METHYL METHACRYLATE) PLANT IN ULSAN | S&I CORP. | 2021.11~2021.12 | E |