번호 | Project | Client | Period | Scope |
---|---|---|---|---|
419 | 3AA DEBOTTLENECKING BASIC DESIGN | LG CHEM | 2020.12~2022.11 | E |
418 | JWH-2 PROJECT NMP TOWER 2 PIPING PRODUCTION | JAEWON INDUSTRIAL | 2020.10~2021.03 | E |
417 | YC 0.1% B2H6 & H2 MIX PROJECT DETAIL DESIGN & PERMIT | WONIK MATERIALS | 2020.12~2021.03 | E |
416 | LOTTE GS CHEMICAL OSBL DETAILED DESIGN | DAYONE ENERGY | 2020.12~2021.02 | E |
415 | YTT BUTANE BLENDING PROJECT RELATED DETAILED DESIGN AND SUPERVISION AGENCY | YTT | 2020.11~2021.03 | E |
414 | HDO BIO DIESEL OVERALL DESIGN | HYUNDAI ENG | 2020.11~2020.12 | E |
413 | ANNUAL OUTPUT OF 65,000MTPA LITHIUM BATTERY CATHODE MATERIAL(1-1) PROJECT | KOREA JAESAE NEUNGWON | 2020.11~2021.09 | E |
412 | PSV DESIGN ADEQUACY REVIEW | LG CHEM | 2020.10~2021.03 | E |
411 | LIQUID EPOXY RESIN(III) 20,000T/Y REVAMPING PROJECT | KUMHO P&B CHEM | 2020.10~2021.10 | E / P / C |
410 | DETAILED DESIGN FOR THE EXPANSION OF 2 NMP TOWERS IN HUNGARY FACTORY | JAEWON INDUSTRIAL | 2020.12~2021.05 | E |
409 | 2020 TA INVESTMENT DESIGN SERVICE | KUMHO MITSUI CHEM | 2020.09~2020.12 | E |
408 | FEASIBILITY STUDY FOR NEW PIPE RACK REVAMPING BETWEEN YONGSUNG AND JEOKRYANG COMPLEX | LG CHEM | 2020.08~2021.02 | E |
407 | FEASIBILITY STUDY FOR NEW/REVAMPING PIPE RACK FOR OUTDOOR OFFICIALS | LG CHEM | 2020.07~2020.12 | E |
406 | GUNSAN PLANT, RE CVD THERMAL STRESS ANALYSIS | OCI | 2020.07~2020.10 | E |
405 | FEASIBILITY ANALYSIS & BASIC DESIGN SERVICE FOR YEOSU INDUSTRIAL COMPLEX'S PUBLIC PIPE RACK & LOADING ARM INSTALLATION PROJECT | KICOX | 2020.07~2021.03 | E |
404 | DETAIL DESIGN & APPROVAL OF BPA HEAVIES | LG CHEM | 2020.07~2020.12 | E |
403 | SULFUR SOLIDIFICATION PLANT DESIGN & APPROVAL | DAEA ENERGY | 2020.07~2021.08 | E |
402 | VCU INSTALLATION TO REDUCE STORAGE EMISSION IN #1/2 FACILITIES AREA FOR LEGAL COMPLIANCE(9000N㎥/HR) | S-OIL | 2020.06~2020.12 | E / P / C |
401 | OA PRODUCTION TEAM 2-EH STORAGE TANK(V-369C) INSTALLATION | HANWHA SOLUTION | 2020.06~2021.03 | E / P / C |
400 | OA OXO CATALYST PROCESS INCREASE P&C CONSTRUCTION | HANWHA SOLUTION | 2020.06~2021.01 | E / P / C |
399 | PLANT 1 KPA(IV) PLANT COOLING WATER GRP PIPE REPLACEMENT WORK | KUMHO P&B CHEM | 2020.06~2020.11 | E / P / C |
398 | METALLOCENE PROCESS BASIC ENGINEERING SERVICE | KUMHO POLY CHEM | 2020.05~2020.12 | E |
397 | DETAIL ENGINEERING SERVICES RELATED TO JPC-550(1,000 L/HR PROCESS UNIT) AND NEW SITE TANK INSTALLATION PROJECT | EM TECH | 2020.05~2021.06 | E |
396 | PIPING DESIGN SERVICE DURING LOTTE CHEM D-NC_R PROJECT | LOTTE E&C | 2020.05~2020.11 | E |
395 | PRODUCTION AND INSTALLATION OF 3 TYPES OF OUTDOOR TRAINING FACILITIES | CHEMICAL SAFETY AGENCY | 2020.05~2020.12 | E / P / C |
394 | JAKCHEON GUSANG DISTRICT VILLAGE SEWER MAINTENANCE PROJECT | GANGJIN-GUN, JEOLLANAM-DO | 2020.05~2022.05 | P / C |
393 | 3RD CONSTRUCTION OF IMPROVEMENT OF ELECTRICAL EQUIPMENT IN LOGISTICS CENTER | GS CALTEX | 2020.04~2020.11 | E / P / C |
392 | KP-1 RTO-1(35000NM3/HR 2EA) INSTALLATION PROJECT | KUMHO POLY CHEM | 2020.04~2021.12 | E / P / C |
391 | DETAIL DESIGN FOR E PROJECT IN YANGCHEONG PLANT | WONIK MATERIALS | 2020.03~2021.01 | E |
390 | YEOSU NO.2 COMPLEX PROJECT (PIPING FIELD ENGINEERING) | GS E&C | 2020.03~2020.12 | FE |