( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
389 NEW INSTALLATION OF D-GE/BDG EXPANSION REACTION FACILITY FOR DAESAN PLANT LOTTE CHEM 2020.03~2021.03 E / P / C
388 BASF YEOSU PLANT HCL 35% EXTERNAL NEW PIPING DESIGN & APPROVAL HANWHA SOLUTION 2020.03~2020.06 E
387 MDI 200,000TONS, CA, HYDROCHLORIC ACID OXIDATION FACILITY BASIC DESIGN KUMHO MITSUI CHEM 2020.03~2020.06 E
386 1 PLANT FLARE LOAD SUMMARY & PRESSURE VESSEL INSTALLATION RELATED DESIGN KUMHO POLY CHEM 2020.02~2020.05 E
385 INSTALLATION OF 5 PETROCHEMICAL TANKS & DESIGN OF ADDITIONAL FACILITIES MARINE GLORY 2020.01~2021.12 E
384 LOTTE CHEM INFRA-2 FEED DESIGN LOTTE E&C 2020.01~2020.03 E
383 DETAIL DESIGN FOR 2,000MTY HIGH PURITY CO2 REFINING & FILLING FACILITY CONSTRUCTION PROJECT WONIK MATERIALS 2020.01~2020.03 E
382 DETAIL DESIGN OF STEAM PIPING INSTALLATION FOR GS CALTEX MFC PLANT HYUNDAI ENERGY 2019.12~2020.01 E
381 LG CHEM Y2C(YEOSU #2 COMPLEX) SAPO PIER EXTERNAL PIPING CONSTRUCTION GS E&C 2019.11~2020.09 E / P / C
380 CHANGWON HYDROGEN LIQUEFACTION PROJECT APPROVAL & TECHNICAL SERVICE DOOSAN HEAVY I&C 2019.11~2020.03 E
379 LG MMA M2 MTBE(METHYL TERTIARY BUTHYL ETHER) EXPANSION DESIGN S&I CORP. 2019.11~2020.12 E
378 PIPE RACK SAFETY DIAGNOSIS OF EXTERNAL PIPELINES BETWEEN 10-2,3 SECTIONS YEOSU TECHNICAL DIRECTOR’S COUNCIL 2019.10~2020.03 E
377 80,000T/Y KAR(KUMHO ACETONE RECYCLE) PROJECT KUMHO P&B CHEM 2019.10~2021.05 E / P / C
376 AIR LIQUID PIPE RACK STRUCTURE STABILITY REVIEW HYUNDAI ENERGY 2019.10~2019.10 E
375 OA PRODUCTION TEAM CATALYTIC PROCESS EXPANSION DESIGN & APPROVAL HANWHA CHEM 2019.10~2021.01 E
374 SBS(STYRENE BUTADIENE STYRENE) 45,000T REVAMPING PROJECT KUMHO PETRO CHEM 2019.10~2020.08 E / P / C
373 MFC PROJECT - 3WHARF PERMIT SERVICE FOR THE 2ND PRODUCT PIER GS CALTEX 2019.10~2021.04 E
372 NEW LOGISTICS BASE CONSTRUCTION KUMHO MITSUI CHEM 2019.10~2020.08 E / P / C
371 GS CALTEX MFC(MIXED FEED CRACKER) OUTSIDE PIPE LINE INSTALLATION WORK GS E&C 2019.09~2020.11 E
370 DETAILED DESIGN OF VCM1 EDC(ETHYLENE DICHLORIDE) REACTION PROCESS IMPROVEMENT LG CHEM 2019.09~2020.07 E
369 GS CALTEX MFC(MIXED FEED CRACKER) OUTER PIPE LINE INSTALLATION WORK GS E&C 2019.09~2021.07 E / C
368 WP4 MTO WORK IN INDONESIA LINE PROJECT LOTTE E&C 2019.08~2019.10 E
367 KUMHO P&B CHEM BPA(BISPHENOL-A)-5 PROJECT HYUNDAI ENG 2019.08~2020.03 E
366 DESIGN & APPROVAL FOR CATALYST MANUFACTURING FACILITIES IN 9 BLOCKS KUMHO PETRO CHEM 2019.08~2020.02 E
365 DETAIL DESIGN OF SAP5 POWDER ASSEMBLY BACK-UP SYSTEM CONSTRUCTION LG CHEM 2019.07~2019.12 E
364 NO.4 DIESEL HDS(87UNIT) CAPACITY INCREASE (75->80KBD) PERMIT SERVICE GS CALTEX 2019.06~2020.05 E
363 KPB2 LER(LIQUID EPOXY RESINS) STORAGE TANK 6EA INSTALLATION DESIGN DAEWOO PLANT 2019.06~2019.11 E
362 YEOSU STATION PIPERACK EXTENSION DESIGN PROJECT E1 2019.05~2019.11 E
361 DETAIL DESIGN OF LPG PIPE CONSTRUCTION FROM YEOSU PLANT TO E1 YEOSU STATION GS CALTEX 2019.05~2019.12 E
360 BASIC DESIGN SERVICE FOR PIPE RACK EXPANSION PROJECT FOR THE INSTALLATION OF NEW PIPING BETWEEN PLANT 1 AND 2 YNCC 2019.04~2019.05 E
<< 1 2 3 4 5 [6] 7 8 9 10 / 18 > >>