359 2019 SHUTDOWN INVESTMENT CONSTRUCTION PROJECT KUMHO MITSUI CHEM 2019.04~2019.06 E / P / C
358 TANK REVAMPING PROJECT DESIGN & APPROVAL PMC TECH 2019.04~2020.03 E
357 TPV(THERMO PLASTIC VULCANIZATE) PLANT PROCESS IMPROVEMENT PROJECT KUMHO POLY CHEM 2019.04~2019.07 E / P / C
356 HIGH TEMPERATURE NYLON A4 MASS PRODUCTION PROCESS BASIC DESIGN FEED LOTTE CHEM 2019.03~2019.08 E
355 BASIC DESIGN FOR DAESAN GE PROCESS BDG PRODUCTION PROCESS LOTTE CHEM 2019.03~2019.08 E
354 GS CALTEX MFC(MIXED FEED CRACKER) PROJECT (PIPING/ELEC./INSTR./CIVIL) GS E&C 2019.02~2021.04 E
353 CDC PROJECT ORGANIC CATALYST & OSBL DETAIL DESIGN SERVICE S&I CORP. 2019.02~2020.01 E
352 REPLACING MMA(METHYL METHACRYLATE) PROCESS INSTRUMENT & LINE IN MMA3 PLANT LG MMA 2019.02~2019.11 E / P / C
351 MMA3 PLANT MA PRODUCT TOWER REPLACEMENT AND INSTALLATION LG MMA 2019.02~2019.11 E
350 ETHYLENE & BTX(BENZENE TOLUENE XYLENE) AREA ENERGY SAVING PROJECT YNCC 2019.01~2019.06 E / P / C
349 PETROCHEMICAL 2TEAM NO.2 AROMATICS PROCESS THROUGHPUT INCREASE BASIC/DETAILED DESIGN AND PERMIT GS CALTEX 2019.01~2019.10 E
348 VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 2) KOREA VOPAK TERMINAL 2018.12~2020.12 E / P / C
347 VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 1) KOREA VOPAK TERMINAL 2018.12~2020.12 E / P / C
346 SIHWA GABLE-INFRASTRUCTURE EPC PROJECT VERSUM PM KOREA 2018.12~2019.05 E / P / C
345 DAESAN PLANT D-EG ½ WASTE HEAT RECOVERY ENERGY SAVING PROJECT LOTTE CHEM 2018.12~2019.11 E / P / C
344 PELLET STEP II PROJECT KUMHO POLY CHEM 2018.12~2019.10 E / P / C
343 TURKMENISTAN, MTO PROJECT KOREA PLANT INDUSTRY ASSOCICATION 2018.12~2019.07 E
342 CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(OUTSIDE THE FACTORY) GS CALTEX 2018.12~2019.06 E
341 CONSTRUCTION OF 3D INSPECTION DRAWING FOR OFFSITE PIPING IN THE PLANT 1 GS CALTEX 2018.12~2019.06 E
340 LG CHEM Y2C PROJECT (ETHYLENE 800,000MT/Y) GS E&C 2018.11~2021.06 E
339 PLANT 2 DEBOTTLENECKING PRE-ENGINEERING KUMHO POLY CHEM 2018.11~2019.01 E
338 WASTEWATER TREATMENT PLANT REVAMPING DETAILED DESIGN AND PERMIT Q-BIO TECH 2018.11~2019.07 E
337 FEASIBILITY STUDY(YEOSU PLANT~E1 LPG PIPE SEISMIC DESIGN RELATED) GS CALTEX 2018.10~2019.01 E
336 VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) SLURRY FILTER TRAIN ADDITIONAL INSTALLATION - BASIC DESIGN GS CALTEX 2018.10~2018.12 E
335 BASIC DESIGN FOR TRANSFER OF DRUM PACKING SYSTEM TO OUTSIDE OF MMA3 PLANT LG MMA 2018.09~2018.12 E
334 DESIGN OF GROUNDING PROJECT FOR EXTERNAL PIPING BETWEEN PLANT AND OIL STORAGE TAM(ANTI-AGING) GS CALTEX 2018.09~2019.03 E
333 TECHNICAL TEAM SF300B DEDICATED LINE TIC AND BASIC DESIGN LG MMA 2018.09~2018.12 E
332 GS CALTEX SAR REVAMPING PROJECT / PIPING DETAILED DESIGN DAWOO E&C 2018.08~2019.11 E
331 STT(I) STORAGE FACILITIES INSTALLATION KUMHO P&B CHEM 2018.07~2020.01 E / P / C
330 DETAILED DESIGN FOR IMPROVEMENT INVESTMENT IN EG CO2 REMOVAL SYSTEM LG CHEM 2018.07~2019.05 E