번호 | Project | Client | Period | Scope |
---|---|---|---|---|
329 | REVISION OF PERMIT ACCORDING TO INCREASE IN BOP FEED THROUGHPUT | GS CALTEX | 2018.07~2018.12 | E |
328 | ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT(DESIGN) | LG MMA | 2018.07~2020.03 | E |
327 | ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT | LG MMA | 2018.07~2020.02 | E / P / C |
326 | MMA2 PLANT DESIGN OF ESTER WORK | LG MMA | 2018.07~2018.10 | E |
325 | GS CALTEX SAR REVAMPING PROJECT PIPING 3D SCANNING & PERMIT | DAWOO E&C | 2018.07~2019.11 | E |
324 | GABLE EXPANSION PROJECT | VERSUM ADM KOREA | 2018.07~2019.03 | E / P / C |
323 | DESIGN-PLANT(PIPING)/YEOSU GROUP ENERGY UNDERGROUND STEAM PIPELINE GROUNDING PROJECT | HYUNDAI E&C | 2018.06~2019.09 | E |
322 | REFINERY 3TEAM PSV DUALIZATION DETAIL DESIGN SERVICE | GS CALTEX | 2018.06~2019.05 | E |
321 | CHEONGJU PLANT 1 CDA REVAMPING WORK(DETAILED DESIGN) | SK AIR GAS | 2018.06~2019.02 | E |
320 | MDI(METHYLENE DIPHENYL ISOCYANATE) 60,000MTPA PLANT REVAMPING PROJECT | KUMHO MITSUI CHEM | 2018.06~2019.01 | E / P / C |
319 | SIHWA OFFICE BUILDING REINFORCEMENT PROJECT | VERSUM PM KOREA | 2018.06~2018.10 | E / P / C |
318 | NEW INSTALLATION M-EC520A1/A2 SYSTEM | KUMHO MITSUI CHEM | 2018.06~2018.07 | P. C |
317 | DETAILED DESIGN RELATED TO THE REPLACEMENT OF LOW-VOLTAGE ELECTRICAL FACILITIES IN THE PLANT 1 | YNCC | 2018.06~2019.07 | E |
316 | MFC FEED PROJECT (CIVIL DESIGN) | GS E&C | 2018.06~2019.05 | E |
315 | BUTENE-1, RBD PROJECT BULK MATERIAL PURCHASE PROVISIONAL CONTRACT | LG CHEM | 2018.05~2019.01 | E / P |
314 | DEMOLITION WORK AT SIHWA PLANT | VERSUM MATERIALS | 2018.05~2018.10 | E / P / C |
313 | BPA 30,000TON REVAMPING DETAILED DESIGN AND 1 CASE | LG CHEM | 2018.05~2019.04 | E |
312 | BDEP DEVELOPMENT FOR NEW STORAGE TANKS INSTALLATION | SHELL KOREA | 2018.06~2018.07 | E |
311 | VRU(VAPOR RECOVERY UNIT) INSTALLATION | LOTTE CHEM | 2018.04~2018.11 | P / C |
310 | OSBL PIPE RACK INSTALLATION PROJECT | HANWHA CHEM | 2018.04~2018.09 | E / P / C |
309 | BUTENE-1, RBD PROJECT CONSTRUCTION | LG CHEM | 2018.04~2019.01 | P / C |
308 | BASIC DESIGN PROJECT | FARMHANNONG | 2018.04~2018.04 | E |
307 | SAP5(SUPER ABSORBENT POLYMER) 15,000 TON DBN PROJECT | LG CHEM | 2018.04~2018.10 | E |
306 | DETAIL DESIGN FOR EXTENSION COMPLEX UTILITY CENTER & INFRASTRUCTURE CONSTRUCTION | LG CHEM | 2018.04~2019.03 | E |
305 | 2018 NCC PROJECT(LG CHEM NCC PROCESS IMPROVEMENT PROJECT) | GS E&C | 2018.04~2018.12 | E |
304 | MIXTURE-1 PROJECT | BASF | 2018.03~2019.03 | E / P / C |
303 | CA1 ELECTROLYZER PILOT FACILITY PROJECT | LG CHEM | 2018.03~2018.12 | E / P / C |
302 | YEOSU CA2 GENERAL CONTRACTOR | SERVEONE | 2018.03~2019.12 | E |
301 | JNJ(PDP) FEED DESIGN | JAEWON INDUSTRIAL | 2018.03~2018.07 | E |
300 | PYEONGTAEK CMP(CHEMICAL MECHANICAL POLISHING) PROJECT | VERSUM SPC KOREA | 2018.03~2019.01 | E / P / C |