( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
261 | W-TFT CA1 TEAM 35% HYDROCHLORIC ACID SHIPPING INFRASTRUCTURE CONSTRUCTION WORK | HANWHA CHEM | 2017.02~2017.12 | E / P / C |
260 | 2K-1601 MVR SYSTEM INSTALLATION WORK | KOREA SILICON | 2017.01~2017.11 | E / P / C |
259 | DH-1 IMPROVED PROJECT DETAILED DESIGN | HYOSUNG | 2017.01~2017.12 | E |
258 | EPU PROJECT | PEG(IRPC) | 2016.12~2017.06 | E |
257 | LOTTE CHEMICAL STEAM PIPE ADDITIONAL DESIGN | HANWHA ENERGY | 2016.12~2016.12 | E |
256 | BORYEONG COLD STORAGE PLAN CONSTRUCTION | TECHNOCHEM TRADING | 2016.12~2018.06 | E / P / C |
255 | ACRYL RUBBER SYSTEM CONSTRUCTION DESIGN | LG MMA | 2016.12~2017.10 | E |
254 | W-3 PLANT 300T/Y EXPANSION PROJECT | SK MATERIALS | 2016.12~2017.10 | E / P / C |
253 | CUEMEN AND PHENOL WASTE HAT RECOVERY DESIGN WORK | KUMHO P&B CHEM | 2016.12~2016.12 | E |
252 | 1->2ND FACTORY COMMON PIPE DESIGN WORK | KUMHO P&B CHEM | 2016.12~2016.12 | E |
251 | ABS 65,000TPA REVAMPING PROJECT | LOTTE ADVANCED MAT'L | 2016.12~2017.08 | E / P / C |
250 | Y2 REVAMP(CO2 RECYCLE) PROJECT | AIR LIQUIDE KOREA | 2016.12~2017.11 | E / P / C |
249 | PC PLANT | CHEIL INDUSTRIES | 2006.12~2008.12 | E / PS |
248 | DAESAN PROPANE LOW TEMPERATURE TANK CONSTRUCTION DESIGN | POSCO E&C | 2016.11~2019.02 | E |
247 | HYUNDAI OIL BANK REVAMPING EPC PROJECT(PIPING/ELEC./INSTR./CIVIL DESIGN) | HYUNDAI ENG | 2016.11~2018.07 | E |
246 | 2-LINE FACILITY SUPPLEMENTARY CONSTRUCTION DESIGN | KUMHO POLY CHEM | 2016.11~2016.11 | E |
245 | LG CHEM DAESAN PLANT POE ISBL PIPING DESIGN | SERVEONE | 2016.11~2018.12 | E |
244 | STT(I) EXTERNAL STORAGE FACILITIES INSTALLATION | KUMHO P&B CHEM | 2016.11~2017.07 | E / P / C |
243 | JO MDI(METHYLENE DIPHENYL ISOCYANATE) 4,000TPA STORAGE TANK INSTALLATION | KUMHO MITSUI CHEM | 2016.11~2017.05 | E / P / C |
242 | TPV(THERMO PLASTIC VULCANIZATE) 5,000TPA REVAMPING PROJECT | KUMHO POLY CHEM | 2016.10~2018.01 | E / P / C |
241 | MVR(MECHANICAL VAPOR RECOMPRESSION) STEP IV PROJECT | KUMHO P&B CHEM | 2016.10~2017.01 | E / P / C |
240 | H-NC3 PROJECT CAUSTIC STORAGE TANK INSTALLATION | LOTTE CHEM | 2016.09~2017.04 | E / P / C |
239 | MDI REFINING SYSTEM IMPROVEMENT WORK | KUMHO MITSUI CHEM | 2016.08~2016.10 | E / P / C |
238 | NAKPOGAC THREE TANK CONSTRUCTION PROJECT (SYP-1601) | SY TANK TERMINAL | 2016.08~2017.04 | E |
237 | YEOSU GREEN ENERGY STEAM SUPPLY SYSTEM | YEOSU GREEN ENERGY | 2016.08~2018.12 | E |
236 | DESIGN AND PERMIT FOR INSTALLATION OF HYDROCHLORIC ACID SHIPPING INFRASTRUCTURE FOR W-TFT CA PRODUCTION TEAM 1 | HANWHA CHEM | 2016.08~2016.10 | E |
235 | SAPO 600,000BBL TANK DESIGN AND PERMIT | GS CALTEX | 2016.07~2020.06 | E |
234 | E(ETHYLENE PROPYLENE OLIGOMER) PROJECT DESIGN & APPROVAL | DAELIM INDUSTRIAL | 2016.07~2017.09 | E |
233 | YEOSU PLANT H-EG1/2, WASTE HEAT RECOVERY REFRIGERATOR IMPROVEMENT CONSTRUCTION | LOTTE CHEM | 2016.06~2017.05 | E / P / C |
232 | I-FA102 & ADDITIONAL FACILITIES REPLACEMENT WORK | KUMHO MITSUI CHEM | 2016.06~2017.01 | E / P / C |