( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
209 | CHANGES IN THE DEVELOPMENT PLAN OF THE WOOSUNDO DEVELOPMENT PROJECT AND APPROVAL OF THR IMPLEMENTATION PLAN | GS CALTEX | 2015.10~2022.12 | E |
208 | 200,000T/Y PP3(PROPYLENE PURIFICATION C3) PROJECT | HYOSUNG | 2015.08~2016.12 | E |
207 | PE2 TEAM LP-1 RECOVERY PROCESS DETAILED DESIGN TO INCREASE CAPACITY | HANWHA CHEM | 2015.07~2015.12 | E |
206 | PB2(POLY BUTANE) 100,000MTA REVAMPING PROJECT | DAELIM INDUSTRIAL | 2015.07~2017.07 | E |
205 | FEED SERVICE PACKAGE FOR TOURBILLON PROJECT | BASF | 2015.07~2015.11 | E |
204 | NO.2 PMMA MS PRODUCTION FACILITY BUILDING CONSTRUCTION | LG MMA | 2015.07~2016.01 | E / P / C |
203 | BO AND TCO SHIPPING FACILITY DESIGN | PMC TECH | 2015.07~2015.12 | E |
202 | NO.1 AROMATICS PROCESS HEAT EXCHANGE NETWORK IMPROVEMENT | GS CALTEX | 2015.07~2016.04 | E |
201 | ULSAN SRF BOILER STEAM SUPPLYING PROJECT (FLUE GAS TREATMENT EQUIPMENT DELIVERY/ INSTALLATION) | DONGLIM E&G | 2015.07~2016.02 | E |
200 | MVR(MECHANICAL VAPOR RECOMPRESSION) STEPII PROJECT | KUMHO P&B CHEM | 2015.06~2016.04 | E / P / C |
199 | P2 CVD HEAT RECOVERY SYSTEM MANUFACTURING & INSTALLATION | OCI | 2015.04~2015.10 | E / P / C |
198 | KP-1 PLANT 2-LINE MVR(MECHANICAL VAPOR RECOMPRESSION) PROJECT | KUMHO POLY CHEM | 2015.04~2015.11 | E / P / C |
197 | STT(II) BASIC ENGINEERING PACKAGE FOR EXTERNAL STORAGE FACILITY INSTALLATION | SC ENG | 2015.05~2015.05 | E |
196 | THE 3 FACTORY RAW CONVERSION PROJECT | DEOKYANG | 2015.03~2015.12 | E / P / C |
195 | MDI(METHYLENE DIPHENYL ISOCYANATE) & MDA MIXER, M-DA103 INSTALLATION | KUMHO MITSUI CHEM | 2015.05~2015.05 | E / P / C |
194 | No.1 PMMA TANK INSTALLATION | LG MMA | 2015.02~2015.07 | E / P / C |
193 | NEW C4 BALL TANK(3,000㎥) INSTALLATION | KUMHO PETRO CHEM | 2015.01~2015.12 | E / P / C |
192 | PB(POLY BUTANE)2 PLANT 75,000 MTA REVAMPING PROJECT | DAELIM INDUSTRIAL | 2014.11~2016.05 | E / P / C |
191 | COC(COCL2) REACTOR & HCL ADSORPTION TOWER INSTALLATION | KUMHO MITSUI CHEM | 2014.11~2015.05 | E / P / C |
190 | POLY SILICON CAPA-UP DETAIL DESIGN | HANWHA CHEM | 2014.11~2015.08 | E |
189 | TECHNICAL RESEARCH INSTITUTE UTILITY DETAILED DESIGN | S-OIL | 2014.11~2015.12 | E |
188 | MVR(MECHANICAL VAPOR RECOMPRESSION) INSTALLATION | SAMSUNG TECHWIN | 2014.11~2014.11 | E / P / C |
187 | BASIC DESIGN FOR HEATING MEDIUM BOILER PROCESS | HUVIS | 2014.10~2015.05 | E |
186 | LCC D-EG1 DEBOTTNECKING PROJECT (MEG 50,000MT CAPA UP) | LOTTE E&C | 2014.10~2016.09 | E / P / C |
185 | CR-MDI(METHYLENE DIPHENYL ISOCYANATE) STORAGE TANK | KUMHO MITSUI CHEM | 2014.10~2014.12 | E / P / C |
184 | ANIMAL WASTE RECYCLING PROJECT | G&L/BLUE O&M | 2014.09~2015.09 | E |
183 | CO2 LIQUEFIED FACILITY PLANT ENGINEERING | DEOKYANG | 2014.09~2014.11 | E |
182 | IPC REACTOR AND AUXILIARY EQUIPMENT REPLACEMENT WORK | KUMHO MITSUI CHEM | 2014.08~2014.12 | E / P / C |
181 | IPC WASTE GAS TREATMENT FACILITY INSTALLATION WORK | KUMHO MITSUI CHEM | 2014.08~2014.12 | E / P / C |
180 | UGCC ETHYLENE PLANT PIPING/INSTR. FIELD ENGINEERING | GS E&C | 2014.08~2015.09 | FE |