( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
171 | PGC(PROCESS GAS COMPRESSOR) DIFFERENTIAL PRESSURE IMPROVEMENT DESIGN | LG CHEM | 2014.04~2015.06 | E |
170 | 5AA PROJECT | GS E&C | 2014.04~2015.07 | E |
169 | 2014 MDI(METHYLENE DIPHENYL ISOCYANATE) PLANT ANNUAL SHUT-DOWN PROJECT | KUMHO MITSUI CHEM | 2014.02~2014.05 | E / P / C |
168 | H-PC, T-130(MPC REACTION TOWER) MVR(MECHANICAL VAPOR RECOMPRESSING) INSTALLATION PROJECT | LOTTE CHEM | 2014.01~2015.09 | E / P / C |
167 | 2014 NCC EXPANSION PROJECT(PIPING DESIGN) | GS E&C | 2014.01~2015.09 | E |
166 | #3 C3 PURIFICATION SYSTEM | LG CHEM | 2014.01~2015.05 | E |
165 | ELEC./INSTR./CIVIL DESIGN OF 2014 NCC(NAPHTHA CRACKING CENTER) EXPANSION PROJECT | LG TOYO ENG | 2014.01~2014.12 | E |
164 | PIPING DUCT & CHUTE DURING CONSTRUCTION OF EGKr HOT PHASE-2 PROJECT | TOYO ENG | 2014.01~2014.10 | P / C |
163 | ELECTRICAL CONSULTANT SERVICE | LG CHEM | 2013.12~2015.06 | E |
162 | DETAILED DESIGN OF PROCESS STEAM PIPE NETWORK | SAMSUNG FINE CHEM | 2013.12~2015.12 | E |
161 | FALLING FILM EVAPORATOR SYSTEM CONSTRUCTION | KUMHO MITSUI CHEM | 2013.12~2014.05 | E / P / C |
160 | CM2 PROJECT | HANWHA CHEM | 2013.09~2013.09 | E |
159 | UNHYDROGENATED C5 SEPARATION FACILITY CONSTRUCTION PROJECT | LOTTE CHEM | 2013.09~2013.12 | E / P / C |
158 | LOCAL SUPPLIES & WORKS FOR Y2 NG FEEDSTOCK CONVERSION PROJECT | AIR LIQUIDE KOREA | 2013.08~2014.05 | E / P / C |
157 | 9.9MW BACK-PRESSURE TURBINE INSTALLATION PROJECT | HANWHA ENERGY | 2013.08~2015.02 | E |
156 | CA5/OXY5 MATERIAL TAKE OFF | HANWHA CHEM | 2013.08~2013.08 | E |
155 | LIQUID EPOXY RESIN(II) 45,000TPA REVAMPING PROJECT | KUMHO P&B CHEM | 2013.08~2014.07 | E / P / C |
154 | NGL-3200 BEDP(BASIC ENGINEERING DOCUMENTS PACKAGE) ENDORSEMENT | N.I.O.C (S.W.PG) | 2013.07~2013.09 | E |
153 | KUMHO POLY CHEM YEP-V(EPDM) 60,000MT/Y CONSTRUCTION PROJECT | POSCO ENG | 2013.07~2015.11 | E |
152 | NH3 COLD HEAT RECOVERY PROJECT | SAMSUNG FINE CHEM | 2013.07~2013.10 | E / P / C |
151 | RAW MATERIAL STORAGE TANK FARM PROJECT | CHEIL INDUSTRIES | 2013.06~2013.10 | E |
150 | INCHEON INTERNATIONAL LOGISTICS WHARF | HYUNDAI OIL BANK | 2013.05~2016.03 | E |
149 | HR(HEXANE RECOVERY)-Ⅱ | KOREA PETRO CHEM | 2013.05~2014.03 | E |
148 | NEW CRUDE TANK (800,000 BARREL) PROJECT | GS CALTEX | 2013.04~2015.12 | E |
147 | DESIGN & APPROVAL OF LAND & MARINE FACILITIES FOR NO.3 PRODUCT PIER | GS CALTEX | 2013.04~2019.12 | E |
146 | IPC PILOT PLANT INSTALLATION PROJECT | KUMHO MITSUI CHEM | 2013.03~2013.09 | E / P / C |
145 | BRU(BENZENE RECOVERY UNIT) 60,000MT DEBOTTLENECKING PROJECT(EDC: ETHYLENE DICHLORIDE) | LG CHEM | 2013.02~2013.11 | E |
144 | EGKr HOT PROJECT (PIPING/DUCT & CHUTE) | TOYO ENG | 2013.01~2013.12 | E / C |
143 | AP SYNTHETIC RECRYSTALLIZATION PROCESS EXPANSION | HANWHA | 2013.01~2014.01 | E |
142 | 17 CASES INCLUDING M-GB301B/C SUCTION SIZE-UP AND ADDITIONAL PIPING INSTALLATION | KUMHO MITSUI CHEM | 2013.01~2013.04 | E / P / C |