( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
171 PGC(PROCESS GAS COMPRESSOR) DIFFERENTIAL PRESSURE IMPROVEMENT DESIGN LG CHEM 2014.04~2015.06 E
170 5AA PROJECT GS E&C 2014.04~2015.07 E
169 2014 MDI(METHYLENE DIPHENYL ISOCYANATE) PLANT ANNUAL SHUT-DOWN PROJECT KUMHO MITSUI CHEM 2014.02~2014.05 E / P / C
168 H-PC, T-130(MPC REACTION TOWER) MVR(MECHANICAL VAPOR RECOMPRESSING) INSTALLATION PROJECT LOTTE CHEM 2014.01~2015.09 E / P / C
167 2014 NCC EXPANSION PROJECT(PIPING DESIGN) GS E&C 2014.01~2015.09 E
166 #3 C3 PURIFICATION SYSTEM LG CHEM 2014.01~2015.05 E
165 ELEC./INSTR./CIVIL DESIGN OF 2014 NCC(NAPHTHA CRACKING CENTER) EXPANSION PROJECT LG TOYO ENG 2014.01~2014.12 E
164 PIPING DUCT & CHUTE DURING CONSTRUCTION OF EGKr HOT PHASE-2 PROJECT TOYO ENG 2014.01~2014.10 P / C
163 ELECTRICAL CONSULTANT SERVICE LG CHEM 2013.12~2015.06 E
162 DETAILED DESIGN OF PROCESS STEAM PIPE NETWORK SAMSUNG FINE CHEM 2013.12~2015.12 E
161 FALLING FILM EVAPORATOR SYSTEM CONSTRUCTION KUMHO MITSUI CHEM 2013.12~2014.05 E / P / C
160 CM2 PROJECT HANWHA CHEM 2013.09~2013.09 E
159 UNHYDROGENATED C5 SEPARATION FACILITY CONSTRUCTION PROJECT LOTTE CHEM 2013.09~2013.12 E / P / C
158 LOCAL SUPPLIES & WORKS FOR Y2 NG FEEDSTOCK CONVERSION PROJECT AIR LIQUIDE KOREA 2013.08~2014.05 E / P / C
157 9.9MW BACK-PRESSURE TURBINE INSTALLATION PROJECT HANWHA ENERGY 2013.08~2015.02 E
156 CA5/OXY5 MATERIAL TAKE OFF HANWHA CHEM 2013.08~2013.08 E
155 LIQUID EPOXY RESIN(II) 45,000TPA REVAMPING PROJECT KUMHO P&B CHEM 2013.08~2014.07 E / P / C
154 NGL-3200 BEDP(BASIC ENGINEERING DOCUMENTS PACKAGE) ENDORSEMENT N.I.O.C (S.W.PG) 2013.07~2013.09 E
153 KUMHO POLY CHEM YEP-V(EPDM) 60,000MT/Y CONSTRUCTION PROJECT POSCO ENG 2013.07~2015.11 E
152 NH3 COLD HEAT RECOVERY PROJECT SAMSUNG FINE CHEM 2013.07~2013.10 E / P / C
151 RAW MATERIAL STORAGE TANK FARM PROJECT CHEIL INDUSTRIES 2013.06~2013.10 E
150 INCHEON INTERNATIONAL LOGISTICS WHARF HYUNDAI OIL BANK 2013.05~2016.03 E
149 HR(HEXANE RECOVERY)-Ⅱ KOREA PETRO CHEM 2013.05~2014.03 E
148 NEW CRUDE TANK (800,000 BARREL) PROJECT GS CALTEX 2013.04~2015.12 E
147 DESIGN & APPROVAL OF LAND & MARINE FACILITIES FOR NO.3 PRODUCT PIER GS CALTEX 2013.04~2019.12 E
146 IPC PILOT PLANT INSTALLATION PROJECT KUMHO MITSUI CHEM 2013.03~2013.09 E / P / C
145 BRU(BENZENE RECOVERY UNIT) 60,000MT DEBOTTLENECKING PROJECT(EDC: ETHYLENE DICHLORIDE) LG CHEM 2013.02~2013.11 E
144 EGKr HOT PROJECT (PIPING/DUCT & CHUTE) TOYO ENG 2013.01~2013.12 E / C
143 AP SYNTHETIC RECRYSTALLIZATION PROCESS EXPANSION HANWHA 2013.01~2014.01 E
142 17 CASES INCLUDING M-GB301B/C SUCTION SIZE-UP AND ADDITIONAL PIPING INSTALLATION KUMHO MITSUI CHEM 2013.01~2013.04 E / P / C
<< < 11 12 13 [14] 15 16 17 18 19 / 19 >>