사업 Reference
번호 Project Client Period Scope
141 W.W.T(WASTE WATER TREATMENT) FACILITIES EXPANSION PROJECT KUMHO PETRO CHEM 2013.01~2016.07 E / P / C
140 HYDROGEN RECOVERY UNIT STRUCTURE POSCO ENERGY 2013.01~2013.07 C
139 HDO(HEAVY DUTY OIL) STORAGE TANK FARM CONSTRUCTION MANAGEMENT HYUNDAI OIL TERMINAL 2012.12~2013.12 E / P / C
138 INSTALLATION OF PIPE RACKS FOR 26 SECTIONS OF COMMON PIPE RACKS IN YEOSU INDUSTRIAL COMPLEX KUMHO PETRO CHEM 2012.11~2013.02 E / P / C
137 MANUFACTURING AND INSTALLATION WORK RELATED TO REPLACEMENT OF 15 UNITS INCLUDING M-EA160 KUMHO MITSUI CHEM 2012.11~2013.03 E / P / C
136 GSC VGOFCC PROJECT SAPO-PIPELINE SYNTHESIS DESIGN GS E&C 2012.10~2013.01 E
135 HEXANE PROCESS BEDP PROJECT KUMHO PETRO CHEM 2012.10~2013.03 E
134 LG CHEM SM PLANT HEAT SUPPLY PIPE DESIGN HYUNDAI E&C 2012.10~2014.01 E
133 UZBEKISTAN UGCC ETHYLENE 600,000TPA PROJECT (MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) GS E&C 2012.10~2015.01 E
132 NO.4 CDU O/H COMPRESSOR 1 ADDITIONAL INSTALLATION DETAILED DESIGN GS CALTEX 2012.10~2013.10 E
131 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING 2ND ADDITIONAL FACILITY INVESTMENT WORK KUMHO MITSUI CHEM 2012.09~2012.12 E / P / C
130 DIBK(DIISOBUTYL KETONE) DISTILLATION TOWER INSTALLATION PROJECT KUMHO P&B CHEM 2012.08~2012.12 E / P / C
129 LP-1 EXTRUDER & PPB EXTENSION CONSTRUCTION PROJECT HANWHA CHEM 2012.07~2013.04 E / P / C
128 ESTABLISHMENT OF SOLVENT RECOVERY SYSTEM DURING RECYCLE BD KUMHO PETRO CHEM 2012.06~2012.12 E / P / C
127 KUMHO YEP-IV(EPDM) VOC TREATMENT PACKAGE PROJECT DAELIM INDUSTRIAL 2012.06~2013.05 E / P / C
126 HCC SCR(SELECTIVE CATALYTIC REDUCTION) PROJECT HANWHA E&C 2012.05~2013.03 E
125 VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) FIELD ENGINEERING (PIPING/CIVIL) GS E&C 2012.05~2013.02 FE
124 MAA(METHYL METHACRYLATE) EXPANSION PROJECT (PROCESS/MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) GS E&C 2012.04~2013.01 E
123 LIQUID EPOXY RESIN(II) 45,000TPA REVAMPING PROJECT LG CHEM 2012.04~2012.12 E
122 HYPER SALINE WASTE WATER TREATMENT SYSTEM INSTALLATION PROJECT KUMHO MITSUI CHEM 2012.03~2012.09 E / P / C
121 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT MVR(MECHANICAL VAPOR RECOMPRESSING) SYSTEM INSTALLATION KUMHO MITSUI CHEM 2012.02~2012.08 E / P / C
120 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING ADDITIONAL FACILITY INVESTMENT WORK KUMHO MITSUI CHEM 2012.02~2012.07 E / P / C
119 CM2 BASIC ENGINEERING DOCUMENT PACKAGE PROJECT HANWHA CHEM 2012.01~2012.02 E
118 NEW PLANT WASTE HEAT RECOVERY SYSTEM INSTALLATION KUMHO POLY CHEM 2012.01~2013.07 E / P / C
117 DESIGN FOR GS CALTEX VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) PROJECT SAPO-PIPE LINE (PIPING/ELEC./INSTR./CIVIL) GS E&C 2011.11~2013.04 E
116 MIBK(DIISOBUTYL KETONE) 55,000TPA CAPA UP PROJECT KUMHO P&B CHEM 2011.10~2012.10 E / P / C
115 TAME(TERTIARY AMYL ETHER) PROJECT GS E&C 2011.10~2013.05 E
114 BASIC CIVIL DESIGN AMONG HCC BELT CONVEYOR INSTALLATION PROJECT HANWHA E&C 2011.09~2012.03 E / CS
113 Hx REFINE PROCESS IMPROVEMENT PROJECT KOREA PETRO CHEM 2011.09~2012.06 E
112 #4 KERO MEROX(KEROSENE UNIT) PROJECT GS E&C 2011.08~2013.04 E / PS / CS