( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
141 | W.W.T(WASTE WATER TREATMENT) FACILITIES EXPANSION PROJECT | KUMHO PETRO CHEM | 2013.01~2016.07 | E / P / C |
140 | HYDROGEN RECOVERY UNIT STRUCTURE | POSCO ENERGY | 2013.01~2013.07 | C |
139 | HDO(HEAVY DUTY OIL) STORAGE TANK FARM CONSTRUCTION MANAGEMENT | HYUNDAI OIL TERMINAL | 2012.12~2013.12 | E / P / C |
138 | INSTALLATION OF PIPE RACKS FOR 26 SECTIONS OF COMMON PIPE RACKS IN YEOSU INDUSTRIAL COMPLEX | KUMHO PETRO CHEM | 2012.11~2013.02 | E / P / C |
137 | MANUFACTURING AND INSTALLATION WORK RELATED TO REPLACEMENT OF 15 UNITS INCLUDING M-EA160 | KUMHO MITSUI CHEM | 2012.11~2013.03 | E / P / C |
136 | GSC VGOFCC PROJECT SAPO-PIPELINE SYNTHESIS DESIGN | GS E&C | 2012.10~2013.01 | E |
135 | HEXANE PROCESS BEDP PROJECT | KUMHO PETRO CHEM | 2012.10~2013.03 | E |
134 | LG CHEM SM PLANT HEAT SUPPLY PIPE DESIGN | HYUNDAI E&C | 2012.10~2014.01 | E |
133 | UZBEKISTAN UGCC ETHYLENE 600,000TPA PROJECT (MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) | GS E&C | 2012.10~2015.01 | E |
132 | NO.4 CDU O/H COMPRESSOR 1 ADDITIONAL INSTALLATION DETAILED DESIGN | GS CALTEX | 2012.10~2013.10 | E |
131 | MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING 2ND ADDITIONAL FACILITY INVESTMENT WORK | KUMHO MITSUI CHEM | 2012.09~2012.12 | E / P / C |
130 | DIBK(DIISOBUTYL KETONE) DISTILLATION TOWER INSTALLATION PROJECT | KUMHO P&B CHEM | 2012.08~2012.12 | E / P / C |
129 | LP-1 EXTRUDER & PPB EXTENSION CONSTRUCTION PROJECT | HANWHA CHEM | 2012.07~2013.04 | E / P / C |
128 | ESTABLISHMENT OF SOLVENT RECOVERY SYSTEM DURING RECYCLE BD | KUMHO PETRO CHEM | 2012.06~2012.12 | E / P / C |
127 | KUMHO YEP-IV(EPDM) VOC TREATMENT PACKAGE PROJECT | DAELIM INDUSTRIAL | 2012.06~2013.05 | E / P / C |
126 | HCC SCR(SELECTIVE CATALYTIC REDUCTION) PROJECT | HANWHA E&C | 2012.05~2013.03 | E |
125 | VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) FIELD ENGINEERING (PIPING/CIVIL) | GS E&C | 2012.05~2013.02 | FE |
124 | MAA(METHYL METHACRYLATE) EXPANSION PROJECT (PROCESS/MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) | GS E&C | 2012.04~2013.01 | E |
123 | LIQUID EPOXY RESIN(II) 45,000TPA REVAMPING PROJECT | LG CHEM | 2012.04~2012.12 | E |
122 | HYPER SALINE WASTE WATER TREATMENT SYSTEM INSTALLATION PROJECT | KUMHO MITSUI CHEM | 2012.03~2012.09 | E / P / C |
121 | MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT MVR(MECHANICAL VAPOR RECOMPRESSING) SYSTEM INSTALLATION | KUMHO MITSUI CHEM | 2012.02~2012.08 | E / P / C |
120 | MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING ADDITIONAL FACILITY INVESTMENT WORK | KUMHO MITSUI CHEM | 2012.02~2012.07 | E / P / C |
119 | CM2 BASIC ENGINEERING DOCUMENT PACKAGE PROJECT | HANWHA CHEM | 2012.01~2012.02 | E |
118 | NEW PLANT WASTE HEAT RECOVERY SYSTEM INSTALLATION | KUMHO POLY CHEM | 2012.01~2013.07 | E / P / C |
117 | DESIGN FOR GS CALTEX VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) PROJECT SAPO-PIPE LINE (PIPING/ELEC./INSTR./CIVIL) | GS E&C | 2011.11~2013.04 | E |
116 | MIBK(DIISOBUTYL KETONE) 55,000TPA CAPA UP PROJECT | KUMHO P&B CHEM | 2011.10~2012.10 | E / P / C |
115 | TAME(TERTIARY AMYL ETHER) PROJECT | GS E&C | 2011.10~2013.05 | E |
114 | BASIC CIVIL DESIGN AMONG HCC BELT CONVEYOR INSTALLATION PROJECT | HANWHA E&C | 2011.09~2012.03 | E / CS |
113 | Hx REFINE PROCESS IMPROVEMENT PROJECT | KOREA PETRO CHEM | 2011.09~2012.06 | E |
112 | #4 KERO MEROX(KEROSENE UNIT) PROJECT | GS E&C | 2011.08~2013.04 | E / PS / CS |