번호 | Project | Client | Period | Scope |
---|---|---|---|---|
111 | KOREA SILICON 2ND STEAM LINE DETAILED DESIGN | YCOGEN | 2011.08~2012.04 | E |
110 | MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING PROJECT | KUMHO MITSUI CHEM | 2011.07~2012.06 | E / P / C |
109 | DETAILED DESIGN FOR INSTALLATION OF LDPE SECONDARY EXTRUDER(FOR IT PROTECTION FILM) | LG CHEM | 2011.07~2011.12 | E |
108 | 4AA PROJECT CONSTRUCTION FIELD ENGINEERING (PIPING/ELEC./INSTR./CIVIL) | GS E&C | 2011.07~2012.05 | FE |
107 | INJU N20 PLANT & CYLINDER FILLING STATION DESIGN | LINDE KOREA | 2011.06~2012.06 | E / FE |
106 | NO.3 OFF-SITE SUBSTATION EXPANSION AND 2 OTHERS | GS CALTEX | 2011.05~2011.07 | E |
105 | NCC(NAPHTHA CRACKING CENTER) SCORE FURNACE REVAMPING PROJECT | LG CHEM DAESAN | 2011.04~2012.07 | E |
104 | KERO SPLITTER INSTALLATION PROJECT | GS CALTEX | 2011.03~2011.11 | E |
103 | GSC VGOFCC PROJECT DETAILED DESIGN(PIPING/INSTR./CIVIL) | GS E&C | 2011.03~2013.03 | E |
102 | MDA(METHYLENE DIPHENYL AMINE) REVAMPING PROJECT | KUMHO MITSUI CHEM | 2011.03~2011.07 | E / P / C |
101 | CA/EDC (CAUSTIC/ETHYLENE DICHLORIDE) PROJECT | LG CHEM | 2011.02~2011.07 | E |
100 | L-LDPE(LOW DENSITY POLYETHYLENE) PLANT ELASTOMER 13,000TPA DEBOTTLENECK PROJECT | LG CHEM | 2011.01~2012.03 | E / P / C |
99 | STEAM PIPING DESIGN | HYUNDAI E&C | 2010.12~2012.06 | E |
98 | OTK NO.4 EXPANSION PROJECT | ISU E&C | 2010.12~2012.03 | E |
97 | INTRODUCTION OF TVR AND STEAM ACCUMULATOR | S-OIL | 2010.12~2011.07 | E / P / C |
96 | P-52141 CATALYST DEVELOPMENT UNIT ENGINEERING SERVICE | ALBEMARLE KOREA | 2010.09~2011.06 | E / PS / CS |
95 | HONAM PETRO CHEM HPEO(HIGH PURITY ETHYLENE OXIDE) PROJECT | LOTTE E&C | 2010.12~2012.10 | E / P / C |
94 | U-5500 PHENOL TREATMENT PROJECT | KUMHO P&B CHEM | 2010.11~2011.05 | E / P / C |
93 | LG CHEM 4AA PROJECT (MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) | GS E&C | 2010.11~2012.07 | E / PS |
92 | PP PLANT EXTENSION PROJECT | LG CHEM | 2010.08~2011.09 | E |
91 | OIL REFINING 3TEAM ATMOSPHERE EMISSION UNIT IMPROVEMENT | GS CALTEX | 2010.08~2011.07 | E / PS |
90 | YEOSU COGENERATION PLANT DE-COMPRESS | YCOGEN | 2010.08~2011.05 | E / P / C |
89 | YP-1 EXPANSION PROJECT | GS E&C | 2010.08~2011.06 | E / PS |
88 | NEW LED CHEMICAL MATERIAL PLANT ESTABLISHED | LAKE LED | 2010.08~2010.11 | E / P / C |
87 | MYO DO SM G2-SECTION PIPE RACK TRANSFER | LG CHEM | 2010.07~2010.12 | E |
86 | TECHNICAL SELF-RELIANCE FOR 2ND PLANT | KUMHO POLY CHEM | 2010.07~2010.11 | E |
85 | ST EAM SUPPLY AND CONDENSATE RECOVERY PIPING INSTALLATION DESIGN | GS CALTEX | 2010.06~2010.11 | E / PS |
84 | NO.4 DNT PROJECT | GS E&C | 2010.06~2011.06 | E / PS |
83 | SOLVENT CASTING EQUIPMENT ROOM INTERIOR AND CONTROL CONSTRUCTION | SAMSUNG ELEC. | 2010.05~2010.06 | E / P / C |