( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
111 KOREA SILICON 2ND STEAM LINE DETAILED DESIGN YCOGEN 2011.08~2012.04 E
110 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING PROJECT KUMHO MITSUI CHEM 2011.07~2012.06 E / P / C
109 DETAILED DESIGN FOR INSTALLATION OF LDPE SECONDARY EXTRUDER(FOR IT PROTECTION FILM) LG CHEM 2011.07~2011.12 E
108 4AA PROJECT CONSTRUCTION FIELD ENGINEERING (PIPING/ELEC./INSTR./CIVIL) GS E&C 2011.07~2012.05 FE
107 INJU N20 PLANT & CYLINDER FILLING STATION DESIGN LINDE KOREA 2011.06~2012.06 E / FE
106 NO.3 OFF-SITE SUBSTATION EXPANSION AND 2 OTHERS GS CALTEX 2011.05~2011.07 E
105 NCC(NAPHTHA CRACKING CENTER) SCORE FURNACE REVAMPING PROJECT LG CHEM DAESAN 2011.04~2012.07 E
104 KERO SPLITTER INSTALLATION PROJECT GS CALTEX 2011.03~2011.11 E
103 GSC VGOFCC PROJECT DETAILED DESIGN(PIPING/INSTR./CIVIL) GS E&C 2011.03~2013.03 E
102 MDA(METHYLENE DIPHENYL AMINE) REVAMPING PROJECT KUMHO MITSUI CHEM 2011.03~2011.07 E / P / C
101 CA/EDC (CAUSTIC/ETHYLENE DICHLORIDE) PROJECT LG CHEM 2011.02~2011.07 E
100 L-LDPE(LOW DENSITY POLYETHYLENE) PLANT ELASTOMER 13,000TPA DEBOTTLENECK PROJECT LG CHEM 2011.01~2012.03 E / P / C
99 STEAM PIPING DESIGN HYUNDAI E&C 2010.12~2012.06 E
98 OTK NO.4 EXPANSION PROJECT ISU E&C 2010.12~2012.03 E
97 INTRODUCTION OF TVR AND STEAM ACCUMULATOR S-OIL 2010.12~2011.07 E / P / C
96 P-52141 CATALYST DEVELOPMENT UNIT ENGINEERING SERVICE ALBEMARLE KOREA 2010.09~2011.06 E / PS / CS
95 HONAM PETRO CHEM HPEO(HIGH PURITY ETHYLENE OXIDE) PROJECT LOTTE E&C 2010.12~2012.10 E / P / C
94 U-5500 PHENOL TREATMENT PROJECT KUMHO P&B CHEM 2010.11~2011.05 E / P / C
93 LG CHEM 4AA PROJECT (MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) GS E&C 2010.11~2012.07 E / PS
92 PP PLANT EXTENSION PROJECT LG CHEM 2010.08~2011.09 E
91 OIL REFINING 3TEAM ATMOSPHERE EMISSION UNIT IMPROVEMENT GS CALTEX 2010.08~2011.07 E / PS
90 YEOSU COGENERATION PLANT DE-COMPRESS YCOGEN 2010.08~2011.05 E / P / C
89 YP-1 EXPANSION PROJECT GS E&C 2010.08~2011.06 E / PS
88 NEW LED CHEMICAL MATERIAL PLANT ESTABLISHED LAKE LED 2010.08~2010.11 E / P / C
87 MYO DO SM G2-SECTION PIPE RACK TRANSFER LG CHEM 2010.07~2010.12 E
86 TECHNICAL SELF-RELIANCE FOR 2ND PLANT KUMHO POLY CHEM 2010.07~2010.11 E
85 ST EAM SUPPLY AND CONDENSATE RECOVERY PIPING INSTALLATION DESIGN GS CALTEX 2010.06~2010.11 E / PS
84 NO.4 DNT PROJECT GS E&C 2010.06~2011.06 E / PS
83 SOLVENT CASTING EQUIPMENT ROOM INTERIOR AND CONTROL CONSTRUCTION SAMSUNG ELEC. 2010.05~2010.06 E / P / C
82 LHD REACTOR PILOT UNIT ESTABLISHMENT DAELIM INDUSTRIAL 2010.05~2010.07 E / PS
<< < 11 12 13 14 15 [16] 17 18 19 / 19 >>