( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
501 | RFCC FLARE GAS RECOVERY SYSTEM PROJECT DETAILED DESIGN SERVICE | GS CALTEX | 2022.11~2023.12 | E |
500 | PIP(POTASSIUM ISOPRENOXIDE) 1,100MTPA PROJECT BASIC DESIGN | LOTTE CHEM | 2022.11~2023.12 | E |
499 | VRHCR PROCESS 2ND STAGE MEMBRANE NEW CONSTRUCTION DETAILED DESIGN SERVICE | GS CALTEX | 2022.11~2024.03 | E |
498 | DAESAN H2 56,000NM3/HR(52,000TPA) PLANT PROJECT | LG CHEM | 2022.10~2025.03 | E / P / C |
497 | 10-3 SECTION PIPING SAFETY DIAGNOSIS SERVICE | DAYONE ENERGY | 2022.09~2022.11 | E |
496 | 10-3 SECTION PIPE RACK RESTORATION PLAN & STRUCTURAL SAFETY DIAGNOSIS SERVICE | DAYONE ENERGY | 2022.09~2022.12 | E |
495 | SUS SAN(ACRYLONITRILE-STYRENE) 40MTPA REVAMPING PROJECT | LOTTE CHEM | 2022.09~2023.12 | E / P / C |
494 | FEASIBILITY STUDY FOR BY-PRODUCT HYDROGEN SUPPLY PIPE AND WATER SUPPLY PIPE FOR HEAT RECOVERY | GS CALTEX | 2022.09~2022.12 | E |
493 | DETAIL DESIGN SERVICE FOR LG CHEM STEAM SUPPLY PIPING INSTALLATION WORK | HANWHA ENERGY | 2022.08~2022.12 | E |
492 | KKLC BPA WAREHOUSE DESIGN & APPROVAL | KUMHO P&B CHEM | 2022.08~2023.09 | E |
491 | 3rd FACTORY EXTERNAL PIPING PIPE RACK NEW PROJECT | KUMHO P&B CHEM | 2022.07~2024.05 | E / P / C |
490 | DAESAN D PILOT PLANT PROJECT | LG CHEM | 2022.07~2023.08 | E / P / C |
489 | TIAFENACIL PRODUCTION FACILITY BASIC DESIGN | FARMHANNONG | 2022.07~2022.09 | E |
488 | P3 EXENSION BASIC DESIGN & TIC | LX MMA | 2022.07~2022.10 | E |
487 | PBAT 3,000TPA PROJECT | LG CHEM | 2022.07~2023.03 | E / P / C |
486 | WASTE SYNTHETIC RESIN 7,920TPA RECYLED OIL 4,752TPA ENERGY CONVERSION PROJECT | JEONYOUNG R.G.O | 2022.07~2023.05 | E / P / C |
485 | NCC T/A & STEAM NEWORK OPTIMIZATION PROJECT DESIGN | XI C&A | 2022.07~2023.02 | E |
484 | LIVING RESOURCES RECOVERY CENTER INSTALLATION PROJECT (8TPD) | HAMPYEONG-GUN, JEONNAM | 2022.06~2023.06 | P / C |
483 | BASIC & DETAIL DESIGN RELATED TO NO.1 PAREX PROCESS MVR PROJECT | GS E&C | 2022.06~2024.06 | E |
482 | DESIGN & APPROVAL FOR STT(I) MIBK TANK USE CHANGE | KUMHO P&B CHEM | 2022.06~2022.12 | E |
481 | NEW 250,000TPA HPEO REFINING FACILITY IN DAESAN EG-1 PLANT | LOTTE CHEM | 2022.06~2023.12 | E / P / C |
480 | DETAILED DESIGN OF CRESOL STEAM SUPPLY PIPING INSTALLATION WORK | HANWHA ENERGY | 2022.05~2023.05 | E |
479 | BASIC DESIGN OF 810TPD 30% FUMING SULFURIC ACID MANUFACTURING FACILITY | NAMHAE CHEM | 2022.05~2023.08 | E |
478 | LG CHEM ABS REBUILDING PROJECT | LG CHEM | 2022.05~2022.06 | E |
477 | DESIGN SERVIED RELATED TO DISSOLVED REFINED SALT BUSINESS(PHASE 1) | HANJU | 2022.05~2022.09 | E |
476 | VVANADIUM ELECTROLYTE PRODUCTION PLANT CONSTRUCTION (480TPA) | LOTTE CHEM | 2022.05~2023.06 | E / P / C |
475 | LDPE EXTERNAL PIPING PIPE RACK EXTENSION DESIGNLDPE EXTERNAL PIPING PIPE RACK EXTENSION DESIGN (690M) | LG CHEM | 2022.05~2022.12 | E |
474 | FACTORY 1,2 RTO(12000NM3/HR, 23000NM3/HR) INSTALLATION PROJECT | KUMHO P&B CHEM | 2022.05~2023.01 | E / P / C |
473 | VOC IMPROVEMENT DESIGN | KUMHO POLY CHEM | 2022.05~2022.08 | E |
472 | LLDPE WEATHER PILOT OSBL FEED, TIC SERVICE | LG CHEM | 2022.04~2022.07 | E |