( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
501 RFCC FLARE GAS RECOVERY SYSTEM PROJECT DETAILED DESIGN SERVICE GS CALTEX 2022.11~2023.12 E
500 PIP(POTASSIUM ISOPRENOXIDE) 1,100MTPA PROJECT BASIC DESIGN LOTTE CHEM 2022.11~2023.12 E
499 VRHCR PROCESS 2ND STAGE MEMBRANE NEW CONSTRUCTION DETAILED DESIGN SERVICE GS CALTEX 2022.11~2024.03 E
498 DAESAN H2 56,000NM3/HR(52,000TPA) PLANT PROJECT LG CHEM 2022.10~2025.03 E / P / C
497 10-3 SECTION PIPING SAFETY DIAGNOSIS SERVICE DAYONE ENERGY 2022.09~2022.11 E
496 10-3 SECTION PIPE RACK RESTORATION PLAN & STRUCTURAL SAFETY DIAGNOSIS SERVICE DAYONE ENERGY 2022.09~2022.12 E
495 SUS SAN(ACRYLONITRILE-STYRENE) 40MTPA REVAMPING PROJECT LOTTE CHEM 2022.09~2023.12 E / P / C
494 FEASIBILITY STUDY FOR BY-PRODUCT HYDROGEN SUPPLY PIPE AND WATER SUPPLY PIPE FOR HEAT RECOVERY GS CALTEX 2022.09~2022.12 E
493 DETAIL DESIGN SERVICE FOR LG CHEM STEAM SUPPLY PIPING INSTALLATION WORK HANWHA ENERGY 2022.08~2022.12 E
492 KKLC BPA WAREHOUSE DESIGN & APPROVAL KUMHO P&B CHEM 2022.08~2023.09 E
491 3rd FACTORY EXTERNAL PIPING PIPE RACK NEW PROJECT KUMHO P&B CHEM 2022.07~2024.05 E / P / C
490 DAESAN D PILOT PLANT PROJECT LG CHEM 2022.07~2023.08 E / P / C
489 TIAFENACIL PRODUCTION FACILITY BASIC DESIGN FARMHANNONG 2022.07~2022.09 E
488 P3 EXENSION BASIC DESIGN & TIC LX MMA 2022.07~2022.10 E
487 PBAT 3,000TPA PROJECT LG CHEM 2022.07~2023.03 E / P / C
486 WASTE SYNTHETIC RESIN 7,920TPA RECYLED OIL 4,752TPA ENERGY CONVERSION PROJECT JEONYOUNG R.G.O 2022.07~2023.05 E / P / C
485 NCC T/A & STEAM NEWORK OPTIMIZATION PROJECT DESIGN XI C&A 2022.07~2023.02 E
484 LIVING RESOURCES RECOVERY CENTER INSTALLATION PROJECT (8TPD) HAMPYEONG-GUN, JEONNAM 2022.06~2023.06 P / C
483 BASIC & DETAIL DESIGN RELATED TO NO.1 PAREX PROCESS MVR PROJECT GS E&C 2022.06~2024.06 E
482 DESIGN & APPROVAL FOR STT(I) MIBK TANK USE CHANGE KUMHO P&B CHEM 2022.06~2022.12 E
481 NEW 250,000TPA HPEO REFINING FACILITY IN DAESAN EG-1 PLANT LOTTE CHEM 2022.06~2023.12 E / P / C
480 DETAILED DESIGN OF CRESOL STEAM SUPPLY PIPING INSTALLATION WORK HANWHA ENERGY 2022.05~2023.05 E
479 BASIC DESIGN OF 810TPD 30% FUMING SULFURIC ACID MANUFACTURING FACILITY NAMHAE CHEM 2022.05~2023.08 E
478 LG CHEM ABS REBUILDING PROJECT LG CHEM 2022.05~2022.06 E
477 DESIGN SERVIED RELATED TO DISSOLVED REFINED SALT BUSINESS(PHASE 1) HANJU 2022.05~2022.09 E
476 VVANADIUM ELECTROLYTE PRODUCTION PLANT CONSTRUCTION (480TPA) LOTTE CHEM 2022.05~2023.06 E / P / C
475 LDPE EXTERNAL PIPING PIPE RACK EXTENSION DESIGNLDPE EXTERNAL PIPING PIPE RACK EXTENSION DESIGN (690M) LG CHEM 2022.05~2022.12 E
474 FACTORY 1,2 RTO(12000NM3/HR, 23000NM3/HR) INSTALLATION PROJECT KUMHO P&B CHEM 2022.05~2023.01 E / P / C
473 VOC IMPROVEMENT DESIGN KUMHO POLY CHEM 2022.05~2022.08 E
472 LLDPE WEATHER PILOT OSBL FEED, TIC SERVICE LG CHEM 2022.04~2022.07 E
<< 1 2 [3] 4 5 6 7 8 9 10 / 19 > >>