( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
441 | ABS DP 220,000TPA REVAMPING PROJECT FEED DESIGN | LG CHEM | 2021.08~2021.12 | E |
440 | KPIC NEO-II & KBD PROJECT (PIPING/ELEC./INSTR./CIVIL) | GS E&C | 2021.07~2023.03 | E |
439 | TECHNICAL MANAGEMENT TEAM HANYANG BRIDGE FACILITY PRECISE SAFETY DIAGNOSIS | HANWHA SOLUTION | 2021.07~2021.10 | E |
438 | NO.2 MDI PLANT REVAMPING PROJECT(MDI)DESIGN, EQUIPMENT DELIVERY SERVICE | KUMHO MITSUI CHEM | 2021.06~2023.12 | E / P / C |
437 | NO.2 MDI PLANT PROJECT(FOX) DESIGN, EQUIPMENT DELIVERY SERVICE | KUMHO MITSUI CHEM | 2021.06~2023.12 | E / P / C |
436 | PMA 24,000TPA PRODUCTION PROCESS DESIGN | JAEWON INDUSTRIAL | 2021.05~2021.10 | E |
435 | GAS 2 TEAM 0.5TPD AMMONIA HYDROGENATION PROCESS DETAIL DESIGN | WONIK MATERIALS | 2021.04~2021.08 | E |
434 | FACTORY 1 RTO-2(38000NM3/HR 2EA) NEW INSTALLATION WORK | KUMHO POLY CHEM | 2021.04~2021.11 | E / P / C |
433 | 410,000TPA PLANT 3D DESIGN | KUMHO MITSUI CHEM | 2021.04~2021.12 | E |
432 | DETAILED DESIGN FOR PETROLEUM RESIN R-220 DUAL | HANWHA SOLUTION | 2021.04~2022.11 | E |
431 | POHANG PLANT HSPP-MPR-001-PILOT PACKAGE MANUFACTURING WORK | OCI | 2021.03~2021.06 | E / P / C |
430 | ONSAN PLANT NCC,DPG,RU UNIT SAFETY VALVE AND SHUT-OFF VALVE DESIGN SERVICE | KPIC | 2021.03~2021.12 | E |
429 | ACS ORGANIC LOADING PROCESS DEMOLITION AND RESTORATION WORK | LG CHEM | 2021.02~2021.05 | E / P / C |
428 | CIVIL DESIGN AND STEEL STRUCTURE REVIEW RELATED TO NCC PSV DUALIZATION | LG CHEM | 2021.02~2021.10 | E |
427 | EPC WORKS FOR PIPING AMONG LOTTE CHEMICAL 6BLOCK INFRA2 PROJECT | SGC E-TEC E&C | 2021.02~2022.04 | E / P / C |
426 | ISBL/OSBL STEAM SUPLLY PROJECT FOR LOTTE GS CHEMICAL | DAYONE ENERGY | 2021.02~2021.10 | E / P / C |
425 | ABS PLANT NEW FLARE STACK CAPACITY REVIEW & DESIGN | LG CHEM | 2021.01~2021.05 | E |
424 | H2 5TPD HYDROGEN LIQUEFACTION PROJECT (BASIC & DETAIL DESIGN) | DOOSAN ENERBILITY | 2021.01~2023.02 | E |
423 | BUTANE BLENDING PROJECT | YTT | 2021.01~2021.03 | E / P / C |
422 | ABS 65,000TPA→68,000TPA REVAMPING PROJECT BASIC DESIGN & FEED | LOTTE CHEM | 2021.01~2021.04 | E |
421 | FACTORY 2 RTO(65000NM3/HR 2EA) NEW INSTALLATION PROJECT | KUMHO POLY CHEM | 2020.12~2021.09 | E / P / C |
420 | DETAILED DESIGN FOR PVC SL-3 REVAMPING PROJECT (PVC 400,000TPA) | LG CHEM | 2020.12~2022.11 | E |
419 | 3AA DEBOTTLENECKING BASIC DESIGN | LG CHEM | 2020.12~2022.11 | E |
418 | JWH-2 PROJECT NMP TOWER 2 PIPING PRODUCTION | JAEWON INDUSTRIAL | 2020.10~2021.03 | E |
417 | YC 0.1% B2H6 & H2 MIX PROJECT DETAIL DESIGN & PERMIT | WONIK MATERIALS | 2020.12~2021.03 | E |
416 | LOTTE GS CHEMICAL OSBL DETAILED DESIGN | DAYONE ENERGY | 2020.12~2021.02 | E |
415 | YTT BUTANE BLENDING PROJECT RELATED DETAILED DESIGN AND SUPERVISION AGENCY | YTT | 2020.11~2021.03 | E |
414 | HDO BIO DIESEL OVERALL DESIGN | HYUNDAI ENG | 2020.11~2020.12 | E |
413 | ANNUAL OUTPUT OF 65,000TPA LITHIUM BATTERY CATHODE MATERIAL(1-1) PROJECT | KOREA JAESAE NEUNGWON | 2020.11~2021.09 | E |
412 | PSV DESIGN ADEQUACY REVIEW | LG CHEM | 2020.10~2021.03 | E |