441 ABS DP 220,000TPA REVAMPING PROJECT FEED DESIGN LG CHEM 2021.08~2021.12 E
440 KPIC NEO-II & KBD PROJECT (PIPING/ELEC./INSTR./CIVIL) GS E&C 2021.07~2023.03 E
439 TECHNICAL MANAGEMENT TEAM HANYANG BRIDGE FACILITY PRECISE SAFETY DIAGNOSIS HANWHA SOLUTION 2021.07~2021.10 E
438 NO.2 MDI PLANT REVAMPING PROJECT(MDI)DESIGN, EQUIPMENT DELIVERY SERVICE KUMHO MITSUI CHEM 2021.06~2023.12 E / P / C
437 NO.2 MDI PLANT PROJECT(FOX) DESIGN, EQUIPMENT DELIVERY SERVICE KUMHO MITSUI CHEM 2021.06~2023.12 E / P / C
436 PMA 24,000TPA PRODUCTION PROCESS DESIGN JAEWON INDUSTRIAL 2021.05~2021.10 E
435 GAS 2 TEAM 0.5TPD AMMONIA HYDROGENATION PROCESS DETAIL DESIGN WONIK MATERIALS 2021.04~2021.08 E
434 FACTORY 1 RTO-2(38000NM3/HR 2EA) NEW INSTALLATION WORK KUMHO POLY CHEM 2021.04~2021.11 E / P / C
433 410,000TPA PLANT 3D DESIGN KUMHO MITSUI CHEM 2021.04~2021.12 E
432 DETAILED DESIGN FOR PETROLEUM RESIN R-220 DUAL HANWHA SOLUTION 2021.04~2022.11 E
431 POHANG PLANT HSPP-MPR-001-PILOT PACKAGE MANUFACTURING WORK OCI 2021.03~2021.06 E / P / C
430 ONSAN PLANT NCC,DPG,RU UNIT SAFETY VALVE AND SHUT-OFF VALVE DESIGN SERVICE KPIC 2021.03~2021.12 E
429 ACS ORGANIC LOADING PROCESS DEMOLITION AND RESTORATION WORK LG CHEM 2021.02~2021.05 E / P / C
428 CIVIL DESIGN AND STEEL STRUCTURE REVIEW RELATED TO NCC PSV DUALIZATION LG CHEM 2021.02~2021.10 E
427 EPC WORKS FOR PIPING AMONG LOTTE CHEMICAL 6BLOCK INFRA2 PROJECT SGC E-TEC E&C 2021.02~2022.04 E / P / C
426 ISBL/OSBL STEAM SUPLLY PROJECT FOR LOTTE GS CHEMICAL DAYONE ENERGY 2021.02~2021.10 E / P / C
425 ABS PLANT NEW FLARE STACK CAPACITY REVIEW & DESIGN LG CHEM 2021.01~2021.05 E
424 H2 5TPD HYDROGEN LIQUEFACTION PROJECT (BASIC & DETAIL DESIGN) DOOSAN ENERBILITY 2021.01~2023.02 E
423 BUTANE BLENDING PROJECT YTT 2021.01~2021.03 E / P / C
422 ABS 65,000TPA→68,000TPA REVAMPING PROJECT BASIC DESIGN & FEED LOTTE CHEM 2021.01~2021.04 E
421 FACTORY 2 RTO(65000NM3/HR 2EA) NEW INSTALLATION PROJECT KUMHO POLY CHEM 2020.12~2021.09 E / P / C
420 DETAILED DESIGN FOR PVC SL-3 REVAMPING PROJECT (PVC 400,000TPA) LG CHEM 2020.12~2022.11 E
419 3AA DEBOTTLENECKING BASIC DESIGN LG CHEM 2020.12~2022.11 E
418 JWH-2 PROJECT NMP TOWER 2 PIPING PRODUCTION JAEWON INDUSTRIAL 2020.10~2021.03 E
417 YC 0.1% B2H6 & H2 MIX PROJECT DETAIL DESIGN & PERMIT WONIK MATERIALS 2020.12~2021.03 E
416 LOTTE GS CHEMICAL OSBL DETAILED DESIGN DAYONE ENERGY 2020.12~2021.02 E
415 YTT BUTANE BLENDING PROJECT RELATED DETAILED DESIGN AND SUPERVISION AGENCY YTT 2020.11~2021.03 E
414 HDO BIO DIESEL OVERALL DESIGN HYUNDAI ENG 2020.11~2020.12 E
413 ANNUAL OUTPUT OF 65,000TPA LITHIUM BATTERY CATHODE MATERIAL(1-1) PROJECT KOREA JAESAE NEUNGWON 2020.11~2021.09 E
412 PSV DESIGN ADEQUACY REVIEW LG CHEM 2020.10~2021.03 E