( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
381 | LG CHEM Y2C(YEOSU #2 COMPLEX) SAPO PIER EXTERNAL PIPING CONSTRUCTION | GS E&C | 2019.11~2020.09 | E / P / C |
380 | H2 5TPD HYDROGEN LIQUEFACTION PROJECT APPROVAL | DOOSAN ENERBILITY | 2019.11~2020.03 | E |
379 | LG MMA M2 MTBE(METHYL TERTIARY BUTHYL ETHER) 150,000TPA EXPANSION PROJECT | S&I CORP. | 2019.11~2020.12 | E |
378 | PIPE RACK SAFETY DIAGNOSIS OF EXTERNAL PIPELINES BETWEEN 10-2,3 SECTIONS | YEOSU TECHNICAL DIRECTOR’S COUNCIL | 2019.10~2020.03 | E |
377 | 80,000T/Y KAR(KUMHO ACETONE RECYCLE) PROJECT | KUMHO P&B CHEM | 2019.10~2021.05 | E / P / C |
376 | AIR LIQUID PIPE RACK STRUCTURE STABILITY REVIEW | HYUNDAI ENERGY | 2019.10~2019.10 | E |
375 | OA PRODUCTION TEAM CATALYTIC PROCESS EXPANSION DESIGN & APPROVAL | HANWHA CHEM | 2019.10~2021.01 | E |
374 | SBS(STYRENE BUTADIENE STYRENE) 45,000TPA REVAMPING PROJECT | KUMHO PETRO CHEM | 2019.10~2020.08 | E / P / C |
373 | MFC PROJECT - 3WHARF PERMIT SERVICE FOR THE 2ND PRODUCT PIER | GS CALTEX | 2019.10~2021.04 | E |
372 | NEW LOGISTICS BASE CONSTRUCTION | KUMHO MITSUI CHEM | 2019.10~2020.08 | E / P / C |
371 | GS CALTEX MFC(MIXED FEED CRACKER) OUTSIDE PIPE LINE INSTALLATION WORK | GS E&C | 2019.09~2020.11 | E |
370 | DETAILED DESIGN OF VCM1 EDC(ETHYLENE DICHLORIDE) REACTION PROCESS IMPROVEMENT | LG CHEM | 2019.09~2020.07 | E |
369 | GS CALTEX MFC(MIXED FEED CRACKER) OUTER PIPE LINE INSTALLATION WORK | GS E&C | 2019.09~2021.07 | E / C |
368 | WP4 MTO WORK IN INDONESIA LINE PROJECT | LOTTE E&C | 2019.08~2019.10 | E |
367 | KUMHO P&B CHEM BPA(BISPHENOL-A)-5 PROJECT | HYUNDAI ENG | 2019.08~2020.03 | E |
366 | DESIGN & APPROVAL FOR CATALYST MANUFACTURING FACILITIES IN 9 BLOCKS | KUMHO PETRO CHEM | 2019.08~2020.02 | E |
365 | DETAIL DESIGN OF SAP5 POWDER ASSEMBLY BACK-UP SYSTEM CONSTRUCTION | LG CHEM | 2019.07~2019.12 | E |
364 | NO.4 DIESEL HDS(87UNIT) CAPACITY INCREASE (75->80KBD) PERMIT SERVICE | GS CALTEX | 2019.06~2020.05 | E |
363 | KPB2 LER(LIQUID EPOXY RESINS) STORAGE TANK 6EA INSTALLATION DESIGN | DAEWOO PLANT | 2019.06~2019.11 | E |
362 | YEOSU STATION PIPERACK EXTENSION DESIGN PROJECT (2.2KM) | E1 | 2019.05~2019.11 | E |
361 | DETAIL DESIGN OF LPG PIPE CONSTRUCTION FROM YEOSU PLANT TO E1 YEOSU STATION | GS CALTEX | 2019.05~2019.12 | E |
360 | BASIC DESIGN SERVICE FOR PIPE RACK EXPANSION PROJECT FOR THE INSTALLATION OF NEW PIPING BETWEEN PLANT 1 AND 2 | YNCC | 2019.04~2019.05 | E |
359 | 2019 SHUTDOWN INVESTMENT CONSTRUCTION PROJECT | KUMHO MITSUI CHEM | 2019.04~2019.06 | E / P / C |
358 | TANK REVAMPING PROJECT DESIGN & APPROVAL | PMC TECH | 2019.04~2020.03 | E |
357 | TPV(THERMO PLASTIC VULCANIZATE) PLANT PROCESS IMPROVEMENT PROJECT | KUMHO POLY CHEM | 2019.04~2019.07 | E / P / C |
356 | HIGH TEMPERATURE NYLON A4 MASS PRODUCTION PROCESS BASIC DESIGN FEED | LOTTE CHEM | 2019.03~2019.08 | E |
355 | BASIC DESIGN FOR DAESAN GE PROCESS BDG PRODUCTION PROCESS | LOTTE CHEM | 2019.03~2019.08 | E |
354 | GS CALTEX MFC(MIXED FEED CRACKER) PROJECT (PIPING/ELEC./INSTR./CIVIL) | GS E&C | 2019.02~2021.04 | E |
353 | CDC PROJECT ORGANIC CATALYST & OSBL DETAIL DESIGN SERVICE | S&I CORP. | 2019.02~2020.01 | E |
352 | REPLACING MMA(METHYL METHACRYLATE) PROCESS INSTRUMENT & LINE IN MMA3 PLANT | LG MMA | 2019.02~2019.11 | E / P / C |