351 | MMA3 PLANT MA PRODUCT TOWER REPLACEMENT AND INSTALLATION | LG MMA | 2019.02~2019.11 | E |
350 | ETHYLENE & BTX(BENZENE TOLUENE XYLENE) AREA ENERGY SAVING PROJECT | YNCC | 2019.01~2019.06 | E / P / C |
349 | PETROCHEMICAL 2TEAM NO.2 AROMATICS PROCESS THROUGHPUT INCREASE BASIC/DETAILED DESIGN AND PERMIT | GS CALTEX | 2019.01~2019.10 | E |
348 | VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 2) | KOREA VOPAK TERMINAL | 2018.12~2020.12 | E / P / C |
347 | VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 1) | KOREA VOPAK TERMINAL | 2018.12~2020.12 | E / P / C |
346 | SIHWA GABLE-INFRASTRUCTURE EPC PROJECT | VERSUM PM KOREA | 2018.12~2019.05 | E / P / C |
345 | DAESAN PLANT D-EG ½ WASTE HEAT RECOVERY ENERGY SAVING PROJECT | LOTTE CHEM | 2018.12~2019.11 | E / P / C |
344 | PELLET STEP II PROJECT | KUMHO POLY CHEM | 2018.12~2019.10 | E / P / C |
343 | TURKMENISTAN, MTO PROJECT | KOREA PLANT INDUSTRY ASSOCICATION | 2018.12~2019.07 | E |
342 | CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(OUTSIDE THE FACTORY) | GS CALTEX | 2018.12~2019.06 | E |
341 | CONSTRUCTION OF 3D INSPECTION DRAWING FOR OFFSITE PIPING IN THE PLANT 1 | GS CALTEX | 2018.12~2019.06 | E |
340 | LG CHEM Y2C PROJECT (ETHYLENE 800,000TPA) | GS E&C | 2018.11~2021.06 | E |
339 | PLANT 2 DEBOTTLENECKING PRE-ENGINEERING | KUMHO POLY CHEM | 2018.11~2019.01 | E |
338 | WASTEWATER TREATMENT PLANT REVAMPING DETAILED DESIGN AND PERMIT | Q-BIO TECH | 2018.11~2019.07 | E |
337 | FEASIBILITY STUDY(YEOSU PLANT~E1 LPG PIPE SEISMIC DESIGN RELATED) | GS CALTEX | 2018.10~2019.01 | E |
336 | VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) SLURRY FILTER TRAIN ADDITIONAL INSTALLATION - BASIC DESIGN | GS CALTEX | 2018.10~2018.12 | E |
335 | BASIC DESIGN FOR TRANSFER OF DRUM PACKING SYSTEM TO OUTSIDE OF MMA3 PLANT | LG MMA | 2018.09~2018.12 | E |
334 | DESIGN OF GROUNDING PROJECT FOR EXTERNAL PIPING BETWEEN PLANT AND OIL STORAGE TAM(ANTI-AGING) | GS CALTEX | 2018.09~2019.03 | E |
333 | TECHNICAL TEAM SF300B DEDICATED LINE TIC AND BASIC DESIGN | LG MMA | 2018.09~2018.12 | E |
332 | GS CALTEX SAR REVAMPING PROJECT / PIPING DETAILED DESIGN | DAWOO E&C | 2018.08~2019.11 | E |
331 | STT(I) STORAGE FACILITIES INSTALLATION | KUMHO P&B CHEM | 2018.07~2020.01 | E / P / C |
330 | DETAILED DESIGN FOR IMPROVEMENT INVESTMENT IN EG CO2 REMOVAL SYSTEM | LG CHEM | 2018.07~2019.05 | E |
329 | REVISION OF PERMIT ACCORDING TO INCREASE IN BOP FEED THROUGHPUT | GS CALTEX | 2018.07~2018.12 | E |
328 | ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT(DESIGN) | LG MMA | 2018.07~2020.03 | E |
327 | ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT | LG MMA | 2018.07~2020.02 | E / P / C |
326 | MMA2 PLANT DESIGN OF ESTER WORK | LG MMA | 2018.07~2018.10 | E |
325 | GS CALTEX SAR REVAMPING PROJECT PIPING 3D SCANNING & PERMIT | DAWOO E&C | 2018.07~2019.11 | E |
324 | GABLE EXPANSION PROJECT | VERSUM ADM KOREA | 2018.07~2019.03 | E / P / C |
323 | DESIGN-PLANT(PIPING)/YEOSU GROUP ENERGY UNDERGROUND STEAM PIPELINE GROUNDING PROJECT | HYUNDAI E&C | 2018.06~2019.09 | E |
322 | REFINERY 3TEAM PSV DUALIZATION DETAIL DESIGN SERVICE | GS CALTEX | 2018.06~2019.05 | E |