351 MMA3 PLANT MA PRODUCT TOWER REPLACEMENT AND INSTALLATION LG MMA 2019.02~2019.11 E
350 ETHYLENE & BTX(BENZENE TOLUENE XYLENE) AREA ENERGY SAVING PROJECT YNCC 2019.01~2019.06 E / P / C
349 PETROCHEMICAL 2TEAM NO.2 AROMATICS PROCESS THROUGHPUT INCREASE BASIC/DETAILED DESIGN AND PERMIT GS CALTEX 2019.01~2019.10 E
348 VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 2) KOREA VOPAK TERMINAL 2018.12~2020.12 E / P / C
347 VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 1) KOREA VOPAK TERMINAL 2018.12~2020.12 E / P / C
346 SIHWA GABLE-INFRASTRUCTURE EPC PROJECT VERSUM PM KOREA 2018.12~2019.05 E / P / C
345 DAESAN PLANT D-EG ½ WASTE HEAT RECOVERY ENERGY SAVING PROJECT LOTTE CHEM 2018.12~2019.11 E / P / C
344 PELLET STEP II PROJECT KUMHO POLY CHEM 2018.12~2019.10 E / P / C
343 TURKMENISTAN, MTO PROJECT KOREA PLANT INDUSTRY ASSOCICATION 2018.12~2019.07 E
342 CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(OUTSIDE THE FACTORY) GS CALTEX 2018.12~2019.06 E
341 CONSTRUCTION OF 3D INSPECTION DRAWING FOR OFFSITE PIPING IN THE PLANT 1 GS CALTEX 2018.12~2019.06 E
340 LG CHEM Y2C PROJECT (ETHYLENE 800,000TPA) GS E&C 2018.11~2021.06 E
339 PLANT 2 DEBOTTLENECKING PRE-ENGINEERING KUMHO POLY CHEM 2018.11~2019.01 E
338 WASTEWATER TREATMENT PLANT REVAMPING DETAILED DESIGN AND PERMIT Q-BIO TECH 2018.11~2019.07 E
337 FEASIBILITY STUDY(YEOSU PLANT~E1 LPG PIPE SEISMIC DESIGN RELATED) GS CALTEX 2018.10~2019.01 E
336 VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) SLURRY FILTER TRAIN ADDITIONAL INSTALLATION - BASIC DESIGN GS CALTEX 2018.10~2018.12 E
335 BASIC DESIGN FOR TRANSFER OF DRUM PACKING SYSTEM TO OUTSIDE OF MMA3 PLANT LG MMA 2018.09~2018.12 E
334 DESIGN OF GROUNDING PROJECT FOR EXTERNAL PIPING BETWEEN PLANT AND OIL STORAGE TAM(ANTI-AGING) GS CALTEX 2018.09~2019.03 E
333 TECHNICAL TEAM SF300B DEDICATED LINE TIC AND BASIC DESIGN LG MMA 2018.09~2018.12 E
332 GS CALTEX SAR REVAMPING PROJECT / PIPING DETAILED DESIGN DAWOO E&C 2018.08~2019.11 E
331 STT(I) STORAGE FACILITIES INSTALLATION KUMHO P&B CHEM 2018.07~2020.01 E / P / C
330 DETAILED DESIGN FOR IMPROVEMENT INVESTMENT IN EG CO2 REMOVAL SYSTEM LG CHEM 2018.07~2019.05 E
329 REVISION OF PERMIT ACCORDING TO INCREASE IN BOP FEED THROUGHPUT GS CALTEX 2018.07~2018.12 E
328 ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT(DESIGN) LG MMA 2018.07~2020.03 E
327 ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT LG MMA 2018.07~2020.02 E / P / C
326 MMA2 PLANT DESIGN OF ESTER WORK LG MMA 2018.07~2018.10 E
325 GS CALTEX SAR REVAMPING PROJECT PIPING 3D SCANNING & PERMIT DAWOO E&C 2018.07~2019.11 E
324 GABLE EXPANSION PROJECT VERSUM ADM KOREA 2018.07~2019.03 E / P / C
323 DESIGN-PLANT(PIPING)/YEOSU GROUP ENERGY UNDERGROUND STEAM PIPELINE GROUNDING PROJECT HYUNDAI E&C 2018.06~2019.09 E
322 REFINERY 3TEAM PSV DUALIZATION DETAIL DESIGN SERVICE GS CALTEX 2018.06~2019.05 E