( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
291 | LIVESTOCK MANURE REGIONAL INTEGRATED MANAGEMENT CENTER RESOURCE CONVERSION PILOT PROJECT | YEONGJU NONGHYUP | 2018.01~2019.10 | E / P / C |
290 | YEOSU LG CHEM SAP5(SUPER ABSORBENT POLYMER) REVAMPING PROJECT | SERVEONE | 2017.11~2019.05 | E |
289 | DETAIL DESIGN FOR RFCC(RESIDUE FLUID CATALYTIC CRACKING UNIT) WET GAS SCRUBBER INSTALLATION | GS CALTEX | 2017.11~2019.10 | E |
288 | NUMAT PROJECT | VERSUM MATERIALS | 2017.11~2018.03 | E / P / C |
287 | CRF #3,4 BASIC ENGINEERING PACKAGE SERVICE | FARMHANNONG | 2017.11~2019.02 | E |
286 | GS CALTEX VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) PROJECT | GS E&C | 2017.10~2018.04 | E |
285 | ONSAN PLANT SS BOILER AND LP ETHYLENE TANK DETAILED DESIGN | KPIC | 2017.10~2019.04 | E |
284 | SK HYNIX M14 PHASE2B GAS PLANT PROJECT DESIGN | SK AIR GAS | 2017.10~2018.11 | E |
283 | DESIGN RELATED TO INVESTMENT OTHER THAN INSTALLATION OF U-GA206D | KUMHO MITSUI CHEM | 2017.09~2017.11 | E |
282 | THE PROJECT OVERALL DESIGN SERVICE | HANWHA E&C | 2017.09~2019.06 | E |
281 | LG MMA MAA 80,000TPA REVAMPING PROJECT | SERVEONE | 2017.09~2019.08 | E |
280 | MVR DESIGN PROJECT | SEA ENG | 2017.09~2019.03 | E |
279 | MDI 340,000MTPA PLANT PRODUCT SHIPPING SITE IMPROVEMENT WORK | POSCO E&C | 2017.08~2018.04 | P |
278 | THAILAND EFFICIENCY, ENERGY AND ENVIRONMENT(3E) PROJECT(DESIGN) | HYUNDAI ENG | 2017.07~2018.02 | E |
277 | MOKPO STORAGE VRU(VAPOR RECOVERY UNIT) PACKAGE & CONCRETE INSTALLATION WORK | S-OIL | 2017.06~2017.12 | E / P / C |
276 | SS PROJECT EPC LUMP & SUM TURNKEY PROJECT (CH3F 20TON/Y) | SK SHOWA DENKO | 2017.06~2018.12 | E / P / C |
275 | 3NE PROJECT | GS E&C | 2017.05~2019.04 | E |
274 | SER(SOLID EPOXY RESINS) STAGE II 6,000TPA→22,000TPA REVAMPING PROJECT | KUMHO P&B CHEM | 2017.05~2018.02 | E / P / C |
273 | RESEARCH SERVICE FOR INSTALLING ADDITIONAL PIPING DUE TO SATURATION OF UNDERGROUND PIPING IN ONSAN NATIONAL INDUSTRIAL COMPLEX IN ULSAN | KICOX | 2017.05~2017.11 | E |
272 | INSTALLATION OF LINE AND HEAT EXCHANGER FOR INTEGRATED OPERATION OF PP REFRIGERATOR | KUMHO POLY CHEM | 2017.04~2017.10 | E / P / C |
271 | HCC THE PROJECT | HYUNDAI E&C | 2017.04~2017.08 | E |
270 | SIHWA BDP PROJECT ENGINEERING | VERSUM MATERIALS | 2017.04~2017.06 | E |
269 | TOURBILLON PROJECT DIKE INSTALLATION | BASF | 2017.04~2017.06 | E / P / C |
268 | OFF-SITE IMPROVEMENT PLAN DETAIL DESIGN & APPROVAL | SAMSUNG C&T | 2017.04~2018.08 | E |
267 | 4,000TPA PROPYLENE STORAGE TANK PROJECT | PTT TANK TERMINAL | 2017.03~2018.08 | E |
266 | GWANGYANG WORKS FERROMANGANESE LOW-TEMPERATURE ORC POWER GENERATION DESIGN | POSCO ICT | 2017.03~2018.02 | E |
265 | GUNSAN PLANT, AGRICULTURAL WATER UTILIZATION FACILITY INSTALLATION | OCI | 2017.01~2017.08 | E / P / C |
264 | ULSAN PLANT SPP PROJECT DESIGN | KPIC | 2017.03~2018.07 | E |
263 | GS CALTEX No.1 CDU(CRUDE DISTILLATES UNIT) REVAMP PROJECT | GS E&C | 2017.03~2018.05 | E |
262 | IMPROVEMENT CONSTRUCTION FOR MDI(METHYLENE DIPHENYL ISOCYANATE) EXTENSION BOTTLENECK ELIMINATION | KUMHO MITSUI CHEM | 2017.02~2017.04 | E / P / C |