( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
291 LIVESTOCK MANURE REGIONAL INTEGRATED MANAGEMENT CENTER RESOURCE CONVERSION PILOT PROJECT YEONGJU NONGHYUP 2018.01~2019.10 E / P / C
290 YEOSU LG CHEM SAP5(SUPER ABSORBENT POLYMER) REVAMPING PROJECT SERVEONE 2017.11~2019.05 E
289 DETAIL DESIGN FOR RFCC(RESIDUE FLUID CATALYTIC CRACKING UNIT) WET GAS SCRUBBER INSTALLATION GS CALTEX 2017.11~2019.10 E
288 NUMAT PROJECT VERSUM MATERIALS 2017.11~2018.03 E / P / C
287 CRF #3,4 BASIC ENGINEERING PACKAGE SERVICE FARMHANNONG 2017.11~2019.02 E
286 GS CALTEX VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) PROJECT GS E&C 2017.10~2018.04 E
285 ONSAN PLANT SS BOILER AND LP ETHYLENE TANK DETAILED DESIGN KPIC 2017.10~2019.04 E
284 SK HYNIX M14 PHASE2B GAS PLANT PROJECT DESIGN SK AIR GAS 2017.10~2018.11 E
283 DESIGN RELATED TO INVESTMENT OTHER THAN INSTALLATION OF U-GA206D KUMHO MITSUI CHEM 2017.09~2017.11 E
282 THE PROJECT OVERALL DESIGN SERVICE HANWHA E&C 2017.09~2019.06 E
281 LG MMA MAA 80,000TPA REVAMPING PROJECT SERVEONE 2017.09~2019.08 E
280 MVR DESIGN PROJECT SEA ENG 2017.09~2019.03 E
279 MDI 340,000MTPA PLANT PRODUCT SHIPPING SITE IMPROVEMENT WORK POSCO E&C 2017.08~2018.04 P
278 THAILAND EFFICIENCY, ENERGY AND ENVIRONMENT(3E) PROJECT(DESIGN) HYUNDAI ENG 2017.07~2018.02 E
277 MOKPO STORAGE VRU(VAPOR RECOVERY UNIT) PACKAGE & CONCRETE INSTALLATION WORK S-OIL 2017.06~2017.12 E / P / C
276 SS PROJECT EPC LUMP & SUM TURNKEY PROJECT (CH3F 20TON/Y) SK SHOWA DENKO 2017.06~2018.12 E / P / C
275 3NE PROJECT GS E&C 2017.05~2019.04 E
274 SER(SOLID EPOXY RESINS) STAGE II 6,000TPA→22,000TPA REVAMPING PROJECT KUMHO P&B CHEM 2017.05~2018.02 E / P / C
273 RESEARCH SERVICE FOR INSTALLING ADDITIONAL PIPING DUE TO SATURATION OF UNDERGROUND PIPING IN ONSAN NATIONAL INDUSTRIAL COMPLEX IN ULSAN KICOX 2017.05~2017.11 E
272 INSTALLATION OF LINE AND HEAT EXCHANGER FOR INTEGRATED OPERATION OF PP REFRIGERATOR KUMHO POLY CHEM 2017.04~2017.10 E / P / C
271 HCC THE PROJECT HYUNDAI E&C 2017.04~2017.08 E
270 SIHWA BDP PROJECT ENGINEERING VERSUM MATERIALS 2017.04~2017.06 E
269 TOURBILLON PROJECT DIKE INSTALLATION BASF 2017.04~2017.06 E / P / C
268 OFF-SITE IMPROVEMENT PLAN DETAIL DESIGN & APPROVAL SAMSUNG C&T 2017.04~2018.08 E
267 4,000TPA PROPYLENE STORAGE TANK PROJECT PTT TANK TERMINAL 2017.03~2018.08 E
266 GWANGYANG WORKS FERROMANGANESE LOW-TEMPERATURE ORC POWER GENERATION DESIGN POSCO ICT 2017.03~2018.02 E
265 GUNSAN PLANT, AGRICULTURAL WATER UTILIZATION FACILITY INSTALLATION OCI 2017.01~2017.08 E / P / C
264 ULSAN PLANT SPP PROJECT DESIGN KPIC 2017.03~2018.07 E
263 GS CALTEX No.1 CDU(CRUDE DISTILLATES UNIT) REVAMP PROJECT GS E&C 2017.03~2018.05 E
262 IMPROVEMENT CONSTRUCTION FOR MDI(METHYLENE DIPHENYL ISOCYANATE) EXTENSION BOTTLENECK ELIMINATION KUMHO MITSUI CHEM 2017.02~2017.04 E / P / C
<< 1 2 3 4 5 6 7 8 9 [10] / 19 > >>