( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
321 CDA REVAMPING PROJECT DETAILED DESIGN AT CHEONGJU PLANT 1 (CDA 30,000NM3/HR) SK AIR GAS 2018.06~2019.02 E
320 MDI(METHYLENE DIPHENYL ISOCYANATE) 60,000MTPA PLANT REVAMPING PROJECT KUMHO MITSUI CHEM 2018.06~2019.01 E / P / C
319 SIHWA OFFICE BUILDING REINFORCEMENT PROJECT VERSUM PM KOREA 2018.06~2018.10 E / P / C
318 NEW INSTALLATION M-EC520A1/A2 SYSTEM KUMHO MITSUI CHEM 2018.06~2018.07 P. C
317 DETAILED DESIGN RELATED TO THE REPLACEMENT OF LOW-VOLTAGE ELECTRICAL FACILITIES IN THE PLANT 1 YNCC 2018.06~2019.07 E
316 MFC FEED PROJECT (CIVIL DESIGN) GS E&C 2018.06~2019.05 E
315 BUTENE-1, RBD PROJECT BULK MATERIAL PURCHASE PROVISIONAL CONTRACT LG CHEM 2018.05~2019.01 E / P
314 DEMOLITION WORK AT SIHWA PLANT VERSUM MATERIALS 2018.05~2018.10 E / P / C
313 BPA 30,000TPA REVAMPING DETAILED DESIGN & 1 CASE LG CHEM 2018.05~2019.04 E
312 BDEP DEVELOPMENT FOR NEW STORAGE TANKS INSTALLATION SHELL KOREA 2018.06~2018.07 E
311 VRU(VAPOR RECOVERY UNIT) INSTALLATION LOTTE CHEM 2018.04~2018.11 P / C
310 OSBL PIPE RACK INSTALLATION PROJECT HANWHA CHEM 2018.04~2018.09 E / P / C
309 BUTENE-1, RBD PROJECT CONSTRUCTION LG CHEM 2018.04~2019.01 P / C
308 BASIC DESIGN PROJECT FARMHANNONG 2018.04~2018.04 E
307 SAP5(SUPER ABSORBENT POLYMER) 15,000 TON DBN PROJECT LG CHEM 2018.04~2018.10 E
306 DETAIL DESIGN FOR EXTENSION COMPLEX UTILITY CENTER & INFRASTRUCTURE CONSTRUCTION LG CHEM 2018.04~2019.03 E
305 2018 NCC PROJECT(LG CHEM NCC PROCESS IMPROVEMENT PROJECT) GS E&C 2018.04~2018.12 E
304 MIXTURE-1 PROJECT BASF 2018.03~2019.03 E / P / C
303 CA1 ELECTROLYZER PILOT FACILITY PROJECT LG CHEM 2018.03~2018.12 E / P / C
302 YEOSU CA2 GENERAL CONTRACTOR SERVEONE 2018.03~2019.12 E
301 JNJ(PDP) FEED DESIGN (PMA 27,600TPA S200 14,400TPA) JAEWON INDUSTRIAL 2018.03~2018.07 E
300 PYEONGTAEK CMP(CHEMICAL MECHANICAL POLISHING) PROJECT (ACT-CMI, ACT-935 16TPD) VERSUM SPC KOREA 2018.03~2019.01 E / P / C
299 LG CHEM 6AA PROJECT SMS/PSM GS E&C 2018.03~2019.05 E
298 9 BLOCK PIPE RACK DESIGN HANWHA ENERGY 2018.02~2018.11 E
297 CONSTRUCTION OF DISPERSANT SEMI-MASS PRODUCTION FACILITY & SUSPENSION POLYMERIZATION PILOT RECONSTRUCTION LG MMA 2018.02~2018.05 E
296 K-PIA, PTA IG DRYER VENT GAS PREVENTION FACILITY(ACTIVATED CARBON ADSORPTION TOWER) PRODUCTION AT ULSAN PLANT LOTTE CHEM 2018.02~2018.09 E / P
295 ALCHEMY PROJECT (CSP 80MTPY + AMP 15MTPY NEW) VERSUM PM KOREA 2018.02~2019.02 E / P / C
294 LIQUID EPOXY RESIN(III) 45,000TPA LP & LTI PROCESS PROJECT KUMHO P&B CHEM 2018.01~2019.06 E / P / C
293 COMPLEMENTARY WORK RELATED TO COLOR IMPROVEMENT KUMHO MITSUI CHEM 2018.01~2018.04 E / P / C
292 GOJI PROJECT BASIC ENGINEERING AISA STABILIZERS 2018.01~2018.04 E
<< 1 2 3 4 5 6 7 8 [9] 10 / 19 > >>