( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
321 | CDA REVAMPING PROJECT DETAILED DESIGN AT CHEONGJU PLANT 1 (CDA 30,000NM3/HR) | SK AIR GAS | 2018.06~2019.02 | E |
320 | MDI(METHYLENE DIPHENYL ISOCYANATE) 60,000MTPA PLANT REVAMPING PROJECT | KUMHO MITSUI CHEM | 2018.06~2019.01 | E / P / C |
319 | SIHWA OFFICE BUILDING REINFORCEMENT PROJECT | VERSUM PM KOREA | 2018.06~2018.10 | E / P / C |
318 | NEW INSTALLATION M-EC520A1/A2 SYSTEM | KUMHO MITSUI CHEM | 2018.06~2018.07 | P. C |
317 | DETAILED DESIGN RELATED TO THE REPLACEMENT OF LOW-VOLTAGE ELECTRICAL FACILITIES IN THE PLANT 1 | YNCC | 2018.06~2019.07 | E |
316 | MFC FEED PROJECT (CIVIL DESIGN) | GS E&C | 2018.06~2019.05 | E |
315 | BUTENE-1, RBD PROJECT BULK MATERIAL PURCHASE PROVISIONAL CONTRACT | LG CHEM | 2018.05~2019.01 | E / P |
314 | DEMOLITION WORK AT SIHWA PLANT | VERSUM MATERIALS | 2018.05~2018.10 | E / P / C |
313 | BPA 30,000TPA REVAMPING DETAILED DESIGN & 1 CASE | LG CHEM | 2018.05~2019.04 | E |
312 | BDEP DEVELOPMENT FOR NEW STORAGE TANKS INSTALLATION | SHELL KOREA | 2018.06~2018.07 | E |
311 | VRU(VAPOR RECOVERY UNIT) INSTALLATION | LOTTE CHEM | 2018.04~2018.11 | P / C |
310 | OSBL PIPE RACK INSTALLATION PROJECT | HANWHA CHEM | 2018.04~2018.09 | E / P / C |
309 | BUTENE-1, RBD PROJECT CONSTRUCTION | LG CHEM | 2018.04~2019.01 | P / C |
308 | BASIC DESIGN PROJECT | FARMHANNONG | 2018.04~2018.04 | E |
307 | SAP5(SUPER ABSORBENT POLYMER) 15,000 TON DBN PROJECT | LG CHEM | 2018.04~2018.10 | E |
306 | DETAIL DESIGN FOR EXTENSION COMPLEX UTILITY CENTER & INFRASTRUCTURE CONSTRUCTION | LG CHEM | 2018.04~2019.03 | E |
305 | 2018 NCC PROJECT(LG CHEM NCC PROCESS IMPROVEMENT PROJECT) | GS E&C | 2018.04~2018.12 | E |
304 | MIXTURE-1 PROJECT | BASF | 2018.03~2019.03 | E / P / C |
303 | CA1 ELECTROLYZER PILOT FACILITY PROJECT | LG CHEM | 2018.03~2018.12 | E / P / C |
302 | YEOSU CA2 GENERAL CONTRACTOR | SERVEONE | 2018.03~2019.12 | E |
301 | JNJ(PDP) FEED DESIGN (PMA 27,600TPA S200 14,400TPA) | JAEWON INDUSTRIAL | 2018.03~2018.07 | E |
300 | PYEONGTAEK CMP(CHEMICAL MECHANICAL POLISHING) PROJECT (ACT-CMI, ACT-935 16TPD) | VERSUM SPC KOREA | 2018.03~2019.01 | E / P / C |
299 | LG CHEM 6AA PROJECT SMS/PSM | GS E&C | 2018.03~2019.05 | E |
298 | 9 BLOCK PIPE RACK DESIGN | HANWHA ENERGY | 2018.02~2018.11 | E |
297 | CONSTRUCTION OF DISPERSANT SEMI-MASS PRODUCTION FACILITY & SUSPENSION POLYMERIZATION PILOT RECONSTRUCTION | LG MMA | 2018.02~2018.05 | E |
296 | K-PIA, PTA IG DRYER VENT GAS PREVENTION FACILITY(ACTIVATED CARBON ADSORPTION TOWER) PRODUCTION AT ULSAN PLANT | LOTTE CHEM | 2018.02~2018.09 | E / P |
295 | ALCHEMY PROJECT (CSP 80MTPY + AMP 15MTPY NEW) | VERSUM PM KOREA | 2018.02~2019.02 | E / P / C |
294 | LIQUID EPOXY RESIN(III) 45,000TPA LP & LTI PROCESS PROJECT | KUMHO P&B CHEM | 2018.01~2019.06 | E / P / C |
293 | COMPLEMENTARY WORK RELATED TO COLOR IMPROVEMENT | KUMHO MITSUI CHEM | 2018.01~2018.04 | E / P / C |
292 | GOJI PROJECT BASIC ENGINEERING | AISA STABILIZERS | 2018.01~2018.04 | E |